Laserfiche WebLink
<br />2 <br /> <br />Proposal <br />determines that the proposed project does not qualify for the exemption under Section 15183, or the <br />City requests additional analysis, FCS would provide a revised scope of services to provide the <br />environmental analysis necessary. <br />The following tasks are proposed to complete the identified Scope for an IS/Consistency Checklist. <br />Task 1: Project Initiation and Kick-off Meeting <br />FCS will review relevant background material, develop an initial data needs list, and coordinate with the <br />City to schedule a kick-off meeting (it is anticipated that the kick-off meeting will be completed via <br />teleconference). The intent of the kick-off meeting is to clarify and confirm the details of the Scope and <br />schedule, obtain copies of the project plans and other relevant information, and identify key points of <br />contact. FCS will review relevant background documents to ensure project understanding. It is typically <br />helpful to have all relevant team members attend this call (i.e., applicant, civil engineering design team, <br />and general contractor, if applicable). A site visit will be conducted as part of the project initiation <br />process to document existing conditions. <br />Task 2: Preparation of Project Description <br />Using the information obtained during project initiation and the Project Description provided by the <br />applicant team, FCS will prepare a comprehensive Project Description for the City’s review and approval. <br />Because the applicant team already provided a Project Description to the City for review and approval, <br />this Scope assumes that there will be minimal City comments on the Project Description drafted for <br />purposes of the IS/Consistency Checklist. It is assumed that the City will coordinate review with the <br />applicant team and will provide one set of consolidated, vetted comments (with tracked changes in the <br />Word document) on the draft Project Description and a complete RFI to FCS within 1 weeks of submittal. <br />Changes to the Project Description made after approval may require a Change Order and may extend the <br />project schedule. <br />Deliverable <br />• Electronic copy (via email in Microsoft Word and PDF) of the Project Description to City <br />Task 3: Peer Review Applicant-Provided Technical Studies <br />FCS has received the following applicant-provided technical studies to support the preparation of the <br />IS/Consistency Checklist: <br />• Air Quality and Greenhouse Gas <br />Assessment <br />• GHG Emission Compliance Checklist <br />• Preliminary Arborist Report <br /> <br />• Cultural Resources Survey Report <br />• Preliminary Geotechnical Investigation <br />• Phase I Environmental Assessment <br />• Noise and Vibration Assessment <br /> <br />FCS understands that an updated Transportation study will be provided prior to initiation of our work. <br />DocuSign Envelope ID: 8A0CA7AE-0205-438E-B096-2D2D28D11092DocuSign Envelope ID: 19AA1EA2-E6E2-4979-84F3-4D0C7027628D