Laserfiche WebLink
design, but due to the limited budget, a complete sound system would need to be a later <br /> phase improvement. <br /> At this stage, adding project features would require the removal of other proposed <br /> features to balance the budget. It should be noted that further analysis and/or design <br /> modifications would likely impact the possibility of constructing the project between the <br /> 2024 and 2025 summer concert series. <br /> An additional comment that references the desire to locate the new bandstand closer to <br /> the existing bandstand has also been raised. Moving the new bandstand closer to the <br /> existing platform not only provides challenges to creating a cohesive design but would <br /> likely trigger regulatory agency jurisdiction due to its proximity to the creek. In locating <br /> the new bandstand where it was shown in Concept B, significant regulatory <br /> requirements are avoided, which saves a significant amount of time for construction and <br /> significant costs associated with permitting. <br /> Attachment: <br /> 1. Pleasanton Downtown Association letter dated October 6, 2023 <br />