Laserfiche WebLink
In 1994, the Plaza and Towers were installed in Civic Park to commemorate <br /> Pleasanton's 100th anniversary. Over time, the soil supporting the plaza settled, <br /> creating an uneven surface that caused water to pond. The uneven surface created <br /> accessibility issues, and the ponding water eventually impacted the in-ground up- <br /> lighting of the towers' art pieces. <br /> The Centennial Tower Plaza Renovation Project CIP No. 20770 was funded in the <br /> Fiscal Year 2019/20 Capital Improvement Program. The Centennial Towers Plaza <br /> renovation was included under the Downtown Transportation Corridor Parking Lot <br /> project to attract interested bidders, save costs, and promote timely construction. <br /> Civic Park <br /> On August 12, 2021, staff presented the proposed Civic Park landscape renovation plan <br /> to PRC for a review and a recommendation regarding tree replacement. Due to Dutch <br /> elm disease, four heritage American elm (Ulmus americana) trees were removed from <br /> Civic Park in fall 2021. The removal of the elm trees and impacts from the adjacent <br /> construction damaged the turf and irrigation of Civic Park. <br /> DISCUSSION <br /> Transportation Corridor Parking Lot <br /> The downtown transportation corridor parking lot expansion consisted of replacing and <br /> widening the existing 60-stall gravel parking lot to accommodate 139 parking stalls on <br /> an asphalt pavement surface. A new 13-foot-wide multi-use trail was constructed along <br /> the parking lot, separated by a retaining wall. The parking lot was completed to <br /> incorporate more than 2,000 new street trees and plants, Silva Cells to improve tree <br /> health and provide for water treatment and storage, 14 new light poles that provide <br /> lighting for vehicle and pedestrian traffic through the corridor, and three electric vehicle <br /> charging stations that provide charging opportunities for up to five vehicles. <br /> Centennial Towers Plaza <br /> The Centennial Towers Plaza renovation included removing and replacing the plaza <br /> flatwork, lighting, and site furnishings. The engraved centennial bricks were removed, <br /> cleaned, and put back in place with a new concrete base to prevent further settling. <br /> Civic Park <br /> The Civic Park renovation included the planting of four new large red oak trees and two <br /> medium-sized Frontier elm trees to replace the four removed elm trees, new <br /> landscaping strips, irrigation updates, and the grading and replacement of existing turf. <br /> The Civic Park renovation was completed for $110,000 rather than the estimated cost of <br /> $160,700. <br /> Bud et <br /> Several unforeseen conditions were encountered during the project's construction, <br /> requiring change orders and utilization of the project allowances. The final construction <br /> contract cost, including contract change orders, was $2,797,125.47. <br /> Page of ,5 <br />