Laserfiche WebLink
The following change orders resulted in a net increase of $214,139, approximately 8.3 <br /> percent, to the contract amount (see Attachment 2, Contract Change Order Summary): <br /> • Increase of$29,150 for various storm drain system modifications and structural <br /> soil system (Silva Cell) modifications. Actual field conditions required changes in <br /> storm drain layout and Silva Cell adjustment. <br /> • Increase of$2,233 for additional masonry work and rebar on the retaining wall <br /> performed by the contractor due to revisions to the retaining wall and pilaster. <br /> • Increase of $22,591 for additional electrical conduits, cabinet, and light fixture. <br /> Relocation of a PG&E electrical service connection point from Bernal Avenue to <br /> Main Street resulted in additional trenching and conduit installation. <br /> • Increase of $21,900 for landscaping and irrigation modification. Original <br /> landscape work was revised to provide drought-tolerant plants and irrigation <br /> improvements. <br /> • Increase of $2,159 for additional and modification of temporary construction <br /> fence to include work associated with Civic Park renovation. <br /> • Increase of$5,152 for additional compensations or credits for various items such <br /> as storm drain sleeve installation, grade review, concrete curb modification, <br /> trench slurry backfill, demolition of accessibility ramp, relocation of water meter <br /> and backflow, stacking and moving pavers, credit prime coat, credit for paver <br /> base modification. <br /> • Increase of$13,573 for storm drain modification at 164 Main Street and 234 Main <br /> Street, additional wood fence rail at 252 Main Street, cobble installation at drain <br /> inlets, and adjustment of PG&E box to match new paver surface. <br /> • Increase of $105,175 for an additional 1,175 square feet of retaining wall <br /> architecture treatment to complete all sides of the wall and an additional 280 tons <br /> of Class 2 aggregate base. <br /> • Increase of $110,000 for the renovation of Civic Park. <br /> • Increase of $3,714 for paver restoration around the Comcast utility on Main <br /> Street. Relocation of the Comcast facility required paver adjustment to match the <br /> desired grade. Comcast agreed to reimburse the City for this work. <br /> • A balancing change order for a decrease of $101,508 was issued due to a <br /> reduction in contract quantities compared to the engineer's estimate of quantities. <br /> Page 4 of 5 <br />