Laserfiche WebLink
Scope of Work <br /> Preparation of Plans,Specifications and F.stimates <br /> Sunol Boulevard/I-680 Improvements Project <br /> August 21,2023 <br /> • TMP Checklist <br /> • Certification of Utility Facilities <br /> • Risk Register Certification <br /> • Survey File Delivery Form <br /> • Storm Water Data Report Cover Sheet <br /> • Maintaining Existing TMS Elements During Construction Form <br /> • Pedestrian Facilities Compliance Form <br /> • Damage Clause Recommendation for Late Lane Closure <br /> • Constructability Review Certificate of Completion <br /> • Cost Estimate Certification form <br /> • Crumb Rubber Usage Reporting Form <br /> Task 5.6 QC Review <br /> AECOM will perform a Final 100%PS&E QC review. <br /> Task S Deliverables <br /> • Design Plan Sheets <br /> • Special Provisions <br /> • Construction Cost Estimates <br /> • Encroachment Permit Application <br /> • Resident Engineer's File <br /> • Utility Certification Documents <br /> • Lane Closure Charts <br /> • Construction Schedule <br /> • Design Reports not previously approved <br /> • PS&E Forms/Approvals <br /> • Response to 95% PS&E Comments <br /> TASK 6 FINAL PS&E PHASE <br /> Task 6 consists of incorporating comments received from Caltrans' District 4 and the City <br /> final review on the Task 5 submittals and updating the Resident Engineer's file. <br /> AECOM will coordinate with subconsultants and update the Project documents. <br /> Task 6.1 Bid Documents <br /> AECOM will incorporate the comments received from the City and Caltrans' District 4 <br /> Final Review submittal. <br /> Task 6.1.1 Caltrans District Review AECOM will incorporate responses to <br /> comments and changes as a result of the Caltrans District Engineer processing. <br /> Page 25 of 42 <br />