My WebLink
|
Help
|
About
|
Sign Out
05
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2023
>
091923 SPECIAL
>
05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/13/2023 2:06:04 PM
Creation date
9/13/2023 1:53:23 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
9/19/2023
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Scope of Work <br /> Preparation of Plans,Specifications and Estimates <br /> Sunol Boulevard/I-680 Improvements Project <br /> August 21,2023 <br /> TASK 5 100% PS&E PHASE <br /> Task 5 incorporates comments from Task 4 and produces Final 100% PS&E documents <br /> ready for Caltrans District 4 and Engineering Services review and City advertisement. <br /> AECOM will review comments received from the reviewing agencies on the Task 4 <br /> submittals and attend comment resolution meetings (up to 2) with the City, Caltrans and <br /> other agencies to resolve issues. AECOM will incorporate agreed upon comments and <br /> provide Bid Documents for finalizing before advertisement. <br /> The following services and submittals are required from AECOM: <br /> Task 5.1 Plans, Specifications and Estimates <br /> AECOM will update the Plans, Special Provisions and Estimates submitted for Task 4 <br /> and incorporate the agreed upon comments received from the City, Caltrans and its units, <br /> and other agencies. <br /> AECOM will submit the revised Quantities and Cost Estimate to the City and Caltrans. <br /> AECOM will coordinate the plans, specifications and estimates with those of other <br /> design consultants and ensure that highway design interfaces with structures design when <br /> all documents are combined to form a single Project PS&E package. It is understood that <br /> the project will be Advertised, Awarded and Administered by City; therefore, approval <br /> by Caltrans for all nonstandard SSPs will not be required. <br /> Task 5.2 Update Design Reports <br /> AECOM will update and submit the design reports not previously approved under Task <br /> 2. The updates will incorporate the agreed upon comments from the City, Caltrans and <br /> other agencies. <br /> Task 5.3 Encroachment Permit <br /> AECOM will prepare an encroachment permit application for construction for the City's <br /> signature to be submitted to Caltrans. Additionally, AECOM will assist the City in <br /> obtaining permit-to-enter to CITY and the Computer Museum properties, dewatering, and <br /> the other necessary permits for the construction of the Project. <br /> Task 5.4 Resident Engineer's File <br /> AECOM will prepare and submit a Resident Engineer's (RE) file in accordance with <br /> Caltrans' requirements and include project relevant items identified in the Resident <br /> Engineer's file check-off list. <br /> The items that will be included in the RE file will be per Appendix GG — Project Data <br /> Checklist of the PDPM and Section 4-9 of the OSFP Information and Procedures Guide. <br /> Task 5.5 PS&E Forms and Approvals <br /> AECOM will update the Draft PS&E Forms submitted in Task 4 and complete the <br /> necessary Caltrans documents for final review. AECOM will also prepare the following <br /> PS&E Forms and obtain approvals: <br /> Page 24 of 42 <br />
The URL can be used to link to this page
Your browser does not support the video tag.