Laserfiche WebLink
Scope of Work <br /> Preparation of Plans,Specifications and Estimates <br /> Sunol Boulevard/1-680 Improvements Project <br /> August 21,2023 <br /> AECOM will coordinate highway and structure construction schedule information to <br /> prepare the Project Construction Schedule. <br /> Task 4.7 Draft PS&E Forms <br /> AECOM will update the Draft PS&E Forms submitted in Task 3 and complete the <br /> documents for final review. AECOM will also prepare the following Draft Forms: <br /> • Quality Control Certification of First Submittal to DOE <br /> • First Submittal to DOE Checklist <br /> Task 4.8 QC Review <br /> AECOM will perform an in-house Final 95% PS&E QC review. <br /> Task 4.9 Independent Design Check- Structures <br /> An independent check of the retaining walls and bridge widening utilizing the unchecked <br /> details (65%), the design criteria, the Foundation Reports and other pertinent reports and <br /> information will be performed. An independent set of checker's calculations to verify the <br /> design of all the plan details will be developed. The checker will be responsible for <br /> developing an independent set of quantity calculations. <br /> Check calculations shall include analysis and computations that are necessary to <br /> independently check all aspects of the design shown on the unchecked details. Results <br /> from the check calculations shall be compared with the design. Discrepancies shall be <br /> resolved between the designer and checker and the resolutions documented in the <br /> calculations. <br /> Task 4 Deliverables <br /> • Design Standard Decision Document <br /> • Design Plan Sheets <br /> • Special Provisions <br /> • Design Reports not previously approved <br /> • Construction Cost Estimate <br /> • Construction Schedule <br /> • Draft PS&E Forms <br /> • Final Geotechnical and Materials Report <br /> • Final Foundation Report <br /> • Independent Design Check Calculations (Structures) <br /> • Independent Quantity Check Calculations(Structures) <br /> • Response to 65% PS&E Comments <br /> • Electronic files of plan sheets submitted <br /> Page 23 of 42 <br />