My WebLink
|
Help
|
About
|
Sign Out
05
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2023
>
091923 SPECIAL
>
05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/13/2023 2:06:04 PM
Creation date
9/13/2023 1:53:23 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
9/19/2023
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Scope of Work <br /> Preparation of Plans,Specifications and Estimates <br /> Sunol Boulevard/I-680 Improvements Project <br /> August 21,2023 <br /> TASK 4 95% PS&E PHASE <br /> Prior to making submittals of the 95% PS&E documents, AECOM will address the <br /> comments received from the 65% submittal and incorporate them as appropriate. This <br /> will include resolving them with Caltrans and its functional units, Caltrans' Engineering <br /> Services, the City, and other reviewing agencies by attending up to 3 comment resolution <br /> meetings. AECOM will provide written response to the 65% PS&E review comments, <br /> with justification noted for each comment not incorporated. <br /> AECOM will coordinate the plans, specifications and estimates with those of other <br /> design consultants and assure that highway design interfaces with structures design. <br /> AECOM will perform the following activities: <br /> Task 4.1 Supplemental Design Standard Decision Document <br /> AECOM will prepare one Supplemental Design Standard Decision Document, prepared <br /> as per design exceptions identified in Task 3.1, and coordinate with Caltrans' Project <br /> Development for approval. <br /> Task 4.2 Design Plan Sheets <br /> AECOM will incorporate agreed upon comments received from Caltrans, the City and <br /> other agencies into the design plan sheets submitted as directed in Task 3 and prepare <br /> complete highway and structure construction plans. <br /> Task 4.3 Specifications and Special Provisions <br /> AECOM will incorporate agreed upon comments into the Special Provisions and prepare <br /> Special Provisions which are specific to the Project for use with Caltrans' 2022 Standard <br /> Specifications or latest edition. SSP's will be submitted in MS Word format. <br /> AECOM will ensure that construction work items for the Project have a method of <br /> payment stated in the Specifications and are accounted for in the Construction Cost <br /> Estimate. <br /> Task 4.4 Update Design Reports <br /> AECOM will update and submit design reports not previously approved under Task 2. <br /> The updates will incorporate the agreed upon comments from the City, Caltrans and other <br /> agencies. <br /> Task 4.5 Quantities and Cost Estimate <br /> AECOM will update the Construction Quantities and Estimate submitted as described in <br /> Task 3.9. AECOM will submit quantity calculations showing all sketches, diagrams and <br /> dimensions necessary for their use by field inspectors. <br /> Task 4.6 Construction Schedule <br /> AECOM will update the Construction Schedule submitted as described in Task 3.10 and <br /> will notify Caltrans and the City of any difference between the update and the previous <br /> version. <br /> Page 22 of 42 <br />
The URL can be used to link to this page
Your browser does not support the video tag.