Laserfiche WebLink
Scope of Work <br /> Preparation of Plans,Specifications and Estimates <br /> Sunol Boulevard/1-680 Improvements Project <br /> August 21,2023 <br /> Task 2 Deliverables <br /> • Updated Master Geometric Electronic Files <br /> • Geotechnical Sample/Testing/Boring Work Plan <br /> • Bridge Structure Type Selection Report <br /> • Utility Agreement Input <br /> • Draft Design Reports: <br /> o Geotechnical Design and Materials Report <br /> o Project Hazardous Materials Test Report <br /> o Lane Closure Report <br /> o Transportation Management Plan Data Sheet <br /> o Drainage Report <br /> o Storm Water Data Report <br /> o Foundation Reports with Boring Records <br /> TASK 3 65% PS&E PHASE <br /> The purpose of Task 3 is to develop draft plans, specifications and quantities for the <br /> 65% PS&E design, and includes finalizing the right-of-way, utility relocations and <br /> proposed easements, and responding to comments received from the agencies <br /> reviewing Task 2 submittals and identifying and resolving conflicts. The submittal <br /> will consist of design documents that are required for the Project. <br /> AECOM will coordinate the plans, specifications and estimates with those of other <br /> design disciplines of the Project team and ensure that highway design interfaces with <br /> other disciplines. AECOM's activities will include: <br /> Task 3.1 Highway Plan Sheets <br /> AECOM will prepare, coordinate and submit Design Plan Sheets in English units for <br /> all highway design, and ensure that interface information is provided to the other <br /> design consultants. The drawings are to be in MicroStation CADD V8i format and <br /> must be in compliance with Caltrans' requirements. AECOM will prepare the <br /> necessary Design Plan Sheets: <br /> 1. Geometric Base Sheets will be prepared at a scale of 1"= 50'. Base sheets <br /> will include basic horizontal and vertical layout information and identify all <br /> major construction features. These sheets will include the topographic base <br /> mapping. <br /> 2. Typical Cross Sections (no scale) for the highway will be based on the <br /> approved standard sections, including pavement structural sections. <br /> 3. Profiles/Superelevation Diagrams (scale: horiz. 1"=50', vert. 1"=10') will be <br /> prepared for new realigned ramp. It is anticipated that mainline vertical design <br /> data will be detailed on pavement elevation sheets. <br /> Page 17 of 42 <br />