My WebLink
|
Help
|
About
|
Sign Out
05
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2023
>
091923 SPECIAL
>
05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/13/2023 2:06:04 PM
Creation date
9/13/2023 1:53:23 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
9/19/2023
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Scope of Work <br /> Preparation of Plans,Specifications and Estimates <br /> Sunol Boulevard/1-680 Improvements Project <br /> August 21,2023 <br /> Task 2.4 Geotechnical Investigation and Testing <br /> AECOM will evaluate the geotechnical conditions for the Project. The geotechnical <br /> investigation program will: <br /> Field <br /> • Prepare Safe Work Plan for Field Studies <br /> • Obtain Zone 7 Drilling Permit <br /> • Mark explorations for USA and utility clearance by private locating service <br /> • Perform geologic reconnaissance <br /> • Drill up to 13 auger borings to depths ranging from 20 to 50 feet <br /> • Provide Traffic control <br /> Lab <br /> Laboratory testing for design of ground anchor, soil nail and Type 5 ERS as described in <br /> the January 2022 Advanced Planning Study. <br /> Office <br /> Structures <br /> • Perform engineering analyses for design of soil nail, ground anchor and Type 5 <br /> concrete cantilever wall for heights, limits and locations shown in January 2022 APS. <br /> • Report format and content consistent with Caltrans 2021 Geotechnical Manual <br /> guidelines. <br /> Task 2.5 Materials /Geotechnical Design Report <br /> • Prepare one draft Materials Report(MR) and one final MR for design of new <br /> pavements along Sunol Boulevard/Pleasanton Sunol Road with response to up to two <br /> rounds of State comments. As-built structural sections and design TI to be provided <br /> by others. Design of cold plane/overlay of existing pavements, and evaluation of <br /> existing pavements for rehabilitation are beyond the scope of the proposed study. <br /> Assumptions and Exclusions <br /> Actual number of borings subject to change pending additional subsurface/site <br /> information, site reconnaissance to evaluate drill rig accessibility, requisite lane closures, <br /> traffic control, permitted working hours, underground and overhead utility conflicts, and <br /> comments from Caltrans on geotechnical work plan which could require additional <br /> borings, different boring methods or test pits. <br /> One exploration for bridge widening will be left open for 24 hours, subject to Caltrans <br /> and Zone 7 approval, to confirm the absence of free groundwater. Construction of <br /> observation wells and/or installation of vibrating wire piezometers is not proposed or <br /> considered in the cost estimate but could be required by Caltrans geotechnical reviewer <br /> following review of the geotechnical work plan. <br /> Page 13 of 42 <br />
The URL can be used to link to this page
Your browser does not support the video tag.