Scope of Work <br /> Preparation of Plans,Specifications and Estimates <br /> Sunol Boulevard/1-680 Improvements Project <br /> August 21,2023 <br /> project and control location maps, measurement metadata, and other required data. This <br /> report will be provided to CT District 4 (D4) personnel for review and approval. <br /> MTLS Survey Control Report <br /> Following approval of the Supplemental SCR, a MTLS GCP SCR will be prepared. The <br /> raw CRTK data will be reduced, compiled, and analyzed. A Point Derivation Report will <br /> be prepared showing conformity with the horizontal and vertical residuals required for <br /> the CT 3rd Order RTK accuracy level. A minimally-constrained least squares level <br /> adjustment of the differential level survey data will be performed to determine the <br /> integrity of the level measurements. Once analyzed and accepted, a fully-constrained <br /> least squares level adjustment will be performed. As with the Supplemental SCR, the <br /> MTLS GCP SCR will be submitted to CT D4 for review and approval,allowing the <br /> MTLS data collection survey and supplemental topographic design surveys to be <br /> performed. As determined by the AECOM responsible charge surveyor at the time of the <br /> survey, the Supplemental SCR and the MTLS GCP SCR might be combined into one <br /> SCR. <br /> Task 2.3 Structure Type Selection <br /> This task will consist of preparing deliverables consistent with Caltrans Office of Special <br /> Funded Projects (OSFP) Information and Procedures Guide 4-2 which describes the <br /> items needed for the Pre-Type Selection Submittal, Type Selection Submittal and Post- <br /> Type Selection Submittal. The type selection report will be prepared in accordance with <br /> the requirements of the Caltrans' Memo to Designers (MTD) 1-29. It is assumed that a <br /> type selection meeting will not be required. <br /> The Type Selection Report will include the following structures: <br /> The Type Selection Report will include the following: <br /> • General Description of the Project <br /> • Design and Constructability Issues <br /> • Foundation <br /> • Speed of Construction <br /> • Staged Construction of the Structures <br /> • Preliminary Aesthetics <br /> • General Plans <br /> • Construction Costs <br /> • Recommendations <br /> Preliminary Construction Structure Quantity and Cost Estimates in a Caltrans General <br /> Plan format will be developed for the project at this stage. The list of items of work will <br /> be prepared based upon Caltrans' Standard Items of Work and adding items as may be <br /> necessary. The cost estimate will identify construction work items, quantities, unit costs, <br /> and summarize the estimated total structures cost, including allowances for supplemental <br /> work, owner furnished materials, expenses, mobilization and contingencies. <br /> Page 12 of 42 <br />