Laserfiche WebLink
Scope of Work <br /> Preparation of Plans,Specifications and Estimates <br /> Sunol Boulevard/1-680 Improvements Project <br /> August 21,2023 <br /> 2.2.2 Ground Control Surveys <br /> As a basis, the ground control surveys for this project will initially utilize selected <br /> previous approved monuments from the adjacent Interstate 680 (I-680) Express Lanes <br /> Project. Prior to use, a verification survey will be performed to determine the positional <br /> accuracy of the aforementioned I-680 project monuments. Following verification, a <br /> control survey utilizing Global Navigation Satellite System (GNSS), Total Station Survey <br /> System (TSSS), and Differential Levelling methods will be performed to establish <br /> supplemental control stations throughout the project footprint. The control survey will <br /> also include measurements to recovered ROW monuments to aid in land net <br /> development. <br /> 2.2.3 MTLS Surveys <br /> MTLS Ground Control Point Survey <br /> Prior to MTLS data collection, MTLS Ground Control Points (GCP)must be installed <br /> and surveyed. As provided by R.E.Y. Engineers (REY), the mobile LiDAR <br /> subconsultant, 21 GCP's are required for this project. The GCP survey will consist of <br /> two separate surveys: 1) GCP installation and first Conventional Real Time Kinematic <br /> (CRTK) observation, and 2) differential level survey and second CRTK observation from <br /> a different base station location. <br /> MTLS Data Collection and Mapping <br /> REY will perform a Type A MTLS field survey and prepare the mapping product in <br /> Microstation DGN format using CT mapping standards. A map compilation scale of 1"_ <br /> 20' showing one(1) foot contours is anticipated. Due to equipment and accuracy <br /> limitations, the MTLS mapping limits will generally be the hard surface extents but may <br /> include areas outside of those extents such as shoulders, earthen islands at intersections, <br /> driveways, and other similar features where bare ground is visible. <br /> 2.2.4 Supplemental and MTLS Ground Control Point Survey Control Reports <br /> Supplemental Survey Control Report <br /> The raw control data will be reduced, compiled, and analyzed. Measurements from a <br /> minimum three (3), preferably four(4) Continuously Operated Reference Stations <br /> (CORS)will be incorporated. A minimally-constrained least squares adjustment of all <br /> raw survey measurement data will be performed to determine the integrity of the survey <br /> measurements. Once analyzed and accepted, a fully-constrained least squares adjustment <br /> will be performed. Following acceptance of the fully-constrained adjustment, the <br /> Supplemental SCR will be prepared. This SCR will include the GNSS, TSSS, and <br /> differential level measurements for determination of precise coordinates and elevations of <br /> the supplemental control and recovered benchmarks. The Supplemental SCR is a <br /> narrative detailing the purpose of the survey, datums utilized, controlling monumentation, <br /> post-processing to include the minimally- and fully-constrained adjustments, and the <br /> results and conclusions. The Report also includes final coordinates and elevations, <br /> Page I 1 of 42 <br />