My WebLink
|
Help
|
About
|
Sign Out
05
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2023
>
091923 SPECIAL
>
05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/13/2023 2:06:04 PM
Creation date
9/13/2023 1:53:23 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
9/19/2023
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Scope of Work <br /> Preparation of Plans,Specifications and Estimates <br /> Sunol Boulevard/I-680 Improvements Project <br /> August 21,2023 <br /> City. <br /> • Surveys will conform to the current Caltrans Surveys Manual. Datum to be <br /> 1983 NAD (Horizontal) and 1988 NAVD (Vertical). <br /> • Phases of design of improvements which impact existing or proposed <br /> underground utilities will conform to Caltrans' Project Development <br /> Procedures Manual (PDPM)—Encroachments and Utilities (02/28/23). <br /> • Right-of-way appraisal maps will conform to the current Caltrans Right of <br /> Way Manual. <br /> • Any exceptions to applicable design standards (5/20/22) will be approved by <br /> Caltrans via the process outlined in Caltrans Highway Design Manual and <br /> applicable memoranda and design bulletins published by Caltrans. <br /> Exclusions — Any other services not specifically listed will be considered additional <br /> work for which a separate scope, fee and schedule will be prepared. <br /> 3.0 DETAILED SCOPE OF WORK <br /> The Detailed Scope of Work is divided into eight tasks, numbered 1 through 8, which are <br /> summarized below. Submittals will be made in the number and type specified in the <br /> Caltrans Construction Contract Development Guide, and where applicable, the OSFP <br /> Information and Procedures Guide. <br /> SCOPE OF WORK <br /> TASK 1 Project Management <br /> TASK 2 PS&E Support <br /> TASK 3 65%PS&E Phase <br /> TASK 4 95% PS&E Phase <br /> TASK 5 100%PS&E Phase <br /> TASK 6 Final PS&E Phase (Caltrans District 4 and HQ Review) <br /> TASK 7 Right of Way Support <br /> TASK 8 Environmental and Permitting <br /> A detailed description of these tasks, subtasks and list of deliverables are presented below. <br /> TASK 1 PROJECT MANAGEMENT <br /> AECOM will provide project management services for each task for the entire duration <br /> of the Project. The duration of the project is estimated to be 24 months. Management <br /> activities will consist of administration, coordination, attending meetings, scheduling and <br /> quality control as stated in the following paragraphs. The scope includes the preparation <br /> Page 6 of 42 <br />
The URL can be used to link to this page
Your browser does not support the video tag.