Laserfiche WebLink
Scope of Work <br /> Preparation of Plans,Specifications and Estimates <br /> Sunol Boulevard/I-680 Improvements Project <br /> August 21,2023 <br /> Prepare permit documents required from permitting agencies. Prepare right-of-way <br /> certification documents, right-of-way maps, and plats and legal descriptions and provide <br /> right-of-way support. <br /> Prepare Design Cross Sections, Slope Stake Listings, and Resident Engineer's file in <br /> accordance with Caltrans' requirements. <br /> Prepare a construction contract package combining Highways and Structures PS&E <br /> documents. <br /> Participate in a Constructability Review and prepare a construction schedule. <br /> Provide coordination of Project design oversight activities with Caltrans Project <br /> Development(CTPD) and other Caltrans functional units by the CTPD. <br /> Provide coordination of Project activities with stakeholders including, but not limited to, <br /> the State, County, and the City. <br /> Establish a Program and Procedures for Quality Control/ Quality Assurance Plan and <br /> conduct independent Quality Review of documents. <br /> Conduct and document Quality Reviews and make findings and corrective actions <br /> available for the City's review. <br /> Provide utility coordination and potholing. Prepare Utility Report of Investigation (ROI), <br /> Utility Agreements, and Notices to Owners. Prepare utility conflict maps and relocation <br /> alignment maps. <br /> Prepare QMP in accordance with Caltrans' co-op agreement. <br /> 2.3 Applicable Standards: <br /> • The plans, specifications and estimates (PS&E) will be prepared in <br /> accordance with Caltrans' regulations, policies, procedures, manuals and <br /> standards (2023 Standards) in place at the time of signing of the contract. <br /> • Roadway design will be in accordance with the 7th edition (5/20/2022) of the <br /> Caltrans Highway Design Manual, the Manual of Uniform Traffic Control <br /> Devices (Revision 3, July 2022) and the California Supplement to the <br /> MUTCD 2014 Edition (Revision 6 dated March 30, 2021), and the City of <br /> Pleasanton City Standard Details. <br /> • Roadway plans will be prepared in conformance with the current editions of <br /> the Caltrans Plans Preparation Manual (April 14, 2023) and the Caltrans <br /> CADD Users Manual (4/20/22). <br /> • Plans, specifications and estimates will be prepared in conformance with the <br /> current editions of the Caltrans Plans, Specifications and Estimates Guide, <br /> Standard Plans and Standard Specifications (2023 Standards) and <br /> Construction Contract Development Guide (July 2023). City "boilerplate" <br /> special provisions will be used in preparation of the project specifications. It is <br /> assumed that the Project will be advertised, awarded, and administered by the <br /> Page 5 of 42 <br />