My WebLink
|
Help
|
About
|
Sign Out
04
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2023
>
091923 SPECIAL
>
04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/13/2023 1:46:51 PM
Creation date
9/13/2023 1:46:14 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
9/19/2023
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
for publication. If additional hours are required,we will prepare a budget augment to cover the actual <br /> level of effort. FCS will provide copies of the Final EIR to the City, which will be responsible for local <br /> distribution, noticing,and posting. FCS will send copies of the Final EIR directly to state agencies that <br /> commented on the Draft EIR. Finally,this scope of work assumes that City staff will prepare and mail all <br /> notices associated with the Final EIR to local agencies and interested parties. <br /> Deliverables <br /> • Fifty(50)hard copies(appendices on CD) and one (1) electronic version of the Final EIR (including <br /> appendices)to the City <br /> • One(1) CD of the Final EIR to each public agency that commented on the Draft EIR (FCS will be <br /> responsible for this task) <br /> Mitigation Monitoring and Reporting Program <br /> FCS will prepare a comprehensive Mitigation Monitoring and Reporting Program (MMRP), pursuant to <br /> CEQA Guidelines Section 15097.The MMRP will contain all mitigation measures identified in the EIR. <br /> This comprehensive MMRP will provide City staff with a single source of reference to the full range of <br /> mitigation measures to be implemented. For each measure or group of similar measures,the agency <br /> responsible for ensuring proper implementation will be identified, along with the timing and method of <br /> verification. Copies of the MMRP will be included in the Final EIR submittal. <br /> Deliverable <br /> • One (1)electronic version (PDF format)of the MMRP to City <br /> Notice of Determination <br /> FCS will prepare the Notice of Determination(NOD)and provide it to City staff or applicant for filing with <br /> the Alameda County Clerk's Office within five business days of EIR certification.As indicated in this scope of <br /> work,City staff or the applicant will be responsible for filing the NOD and paying the associated filing fees. <br /> Deliverable <br /> • One(1)electronic version (PDF format)of the NOD to the City <br /> Task 10: Findings of Fact/Statement of Overriding Considerations <br /> FCS will prepare the Findings of Fact/Statement of Overriding Consideration pursuant to CEQA <br /> Guidelines Sections 15091 and 15093.The Findings of Fact will provide a brief rationale for each <br /> significant effect that can be mitigated to a less-than-significant level. If the EIR identifies one or more <br /> significant unavoidable impact, a Statement of Overriding Considerations will be prepared that outlines <br /> the economic, legal, social, technological, or other benefits of the project that outweigh its <br /> environmental consequences. <br /> NORTH AMERICA I FUROPF I AFRICA I AUSTRAI IA I ASIA <br /> FIRSTCARBONSOLUTIONS.COM <br />
The URL can be used to link to this page
Your browser does not support the video tag.