Laserfiche WebLink
x <br /> 12 r <br /> z 2A 24 12 12 12 <br /> 2A 16112 1&H2 12 <br /> RO '' 6 <br /> 1�t2 A4k4O '„RNC U'rt.d <br /> 2q 1,.300 ppm-5.200 Opn' <br /> 2 16112 Y 'p _ <br /> 4 N y z e <br /> 8 <br /> 16112 <br /> 24 <br /> 16 <br /> 112 FyERRRi C1 , < 8 yl <br /> z 8 x <br /> Figure 4 — Turnout 4 and Stoneridge Drive (F-1 Line) <br /> Bernal Avenue 18-Inch Water Main (F-4 Line) <br /> A new 18-inch water line is needed on Bernal Avenue from Turnout 5 at the intersection <br /> of Nevada Street and Bernal Avenue to Vineyard Avenue (approximately 1,600 linear <br /> feet) to increase the capacity of the existing 12-inch line going south over the bridge on <br /> Bernal Avenue (Figure 5). Due to the time frame to permit a new line over Bernal Bridge <br /> and Arroyo del Valle, an existing sewer line that has not been put into service will be <br /> repurposed until the new water line can be installed on the bridge. The existing sewer <br /> line piping will be removed from the casing on the bridge and replaced with a new <br /> higher-pressure rated pipe that will meet the potable water system pressures. This will <br /> be designed by Pakpour Consulting Group, Inc. on a time and material basis for a not- <br /> to-exceed amount of$121,216 (see Attachment 4). <br /> - ' W N <br /> Nevada Street <br /> m <br /> � � v <br /> 0 <br /> Z o 0 <br /> m, O <br /> to 8 VIRGINIA WY c <br /> v <br /> 2 3 z <br /> 0 <br /> �c <br /> 3F o <br /> o 4t <br /> Rryq�gv ti 3 <br /> Z� <br /> S� <br /> 8 <br /> Z <br /> '0 8 Bernal Avenue <br /> 12 <br /> 8 � ]. <br /> Figure 5 — Bernal Avenue (F-4 Line) <br /> Page 7 of 10 <br />