My WebLink
|
Help
|
About
|
Sign Out
16
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2023
>
081523 SPECIAL
>
16
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/9/2023 2:47:36 PM
Creation date
8/9/2023 2:47:12 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
8/15/2023
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:2F2A7545-5BC8-4F99-86B9-55D552A3374A <br /> July 28,2023—Page 4 <br /> Nelkie—Turnout 5 Discharge Piping Improvements(F-4 Line)Design Proposal <br /> Optional Service: Construction Support — PCG is available to provide construction support <br /> services at the City's request. Once the City establishes the construction scope and duration, we <br /> can provide the City with a detailed scope of work. <br /> Assumptions <br /> • City does not anticipate permits for the work around the Arroyo Bridge and will handle <br /> permits if required. <br /> • City will coordinate all CEQA documentation. <br /> • City already reached out to utility companies within the area to gather information <br /> therefore this effort is not included in the scope. <br /> • This project is a prevailing wage project and the City will obtain and provide a DIR number <br /> to PCG. <br /> • City does not anticipate potholing. If during design the team determines potholes are in <br /> fact needed, PCG will identify the locations and the City will utilize other consultant <br /> contracts who included potholing in their scope. <br /> • Construction support and record drawings are not included as part of this proposal. The <br /> City will request proposals for this service after the bidding period. <br /> Budget <br /> Principal Senior Project TOTAL <br /> Task Description Engineer Engineer Designer <br /> 40 is <br /> Hours <br /> 1.0 Meetings/Field Investigations/PM 6 60 20 86 <br /> 2.0 Topographic Survey 0 4 8 12 <br /> 3.0 50% Plans, EOPC 4 40 120 164 <br /> 4.0 90% Plans,Specs,and EOPC 4 40 80 124 <br /> 5.0 gid Documents (Plans, Specs, 4 20 40 64 <br /> EOPC) <br /> 6.0 Advertising Period 4 28 8 40 <br /> 7.0 Combined Project Coordination 2 28 10 40 <br /> Total Hours 24 220 286 530 <br /> Direct Labor $5,760 $45,760 $46,046 $97,566 <br /> Topographic Survey- Dains Land Surveying $23,650 <br /> Total Budget $121,216 <br /> *Cost can be reduced by $3000 if USA markings are present at the time of the original survey. <br />
The URL can be used to link to this page
Your browser does not support the video tag.