Laserfiche WebLink
DocuSign Envelope ID:2F2A7545-5BC8-4F99-86B9-55D552A3374A <br /> July 28,2023—Page 5 <br /> Nelkie—Turnout 5 Discharge Piping Improvements(F-4 Line)Design Proposal <br /> Schedule <br /> The following schedule is based on the City's desire to bid the project after the 2023 Thanksgiving <br /> holiday. This schedule assumes a four week turnaround for the survey and one week each for <br /> the City to review 50% and 90% submittals. <br /> • 7/19/23—Order Survey • 10/20/23—90% Plans, Specs, EOPC <br /> • 8/18/23— Receive Survey • 10/30/23—90% Review Meeting <br /> • 9/15/23—50% Plans, EOPC • 11/17/23 — Final Bid Docs <br /> • 9/25/23—50% Review Meeting <br /> Very truly yours, <br /> Pakpour Consulting Group, Inc. <br /> DocuSigned by: <br /> l <br /> 2 �bario�ori <br /> 450012639450405. <br /> Brandon Laurie, P.E. <br /> Senior Engineer <br /> cc: SM Saklaen,PE,City of Pleasanton,;mkloen(hitvofoleasantonca.aov <br /> loubin Pakpour,PE-Pakpour Consulting Group,Ioakpour@pcaenar.com <br /> Steven Yee,PE—Pakpour Consulting Group,s yee@pcaenar.com <br /> David Liebrenz—Pokpour Consulting Group,dliebrenz(a7ocoenar.com <br /> ZL\Projects\Pleasanton-10011.00\20-Turnout Five Discharge Piping Improvements(F4 Line)\Contracts\Agency\20-PLS-Nelkie-23.07.28-Proposal for Design Services for T-S Discharge Piping <br /> Improvements(T4 Line(.doa <br /> pmPAKFU TING <br /> aiiao,ai <br />