My WebLink
|
Help
|
About
|
Sign Out
16
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2023
>
081523 SPECIAL
>
16
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/9/2023 2:47:36 PM
Creation date
8/9/2023 2:47:12 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
8/15/2023
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
improvements will be necessary to meet the future demands of the system, regardless <br /> of the project selected as part of the water supply assessment. <br /> To move forward expeditiously, staff contacted the City's on-call consultants to design <br /> the interim water improvements as a complete project but due to the need to start the <br /> design work and the shortened design time, no singular consultant has the current <br /> capacity to complete the work so the work was divided among three existing on-call <br /> consultants: Woodard & Curran, Pakpour Consulting Group, Inc. and Mark Thomas & <br /> Company, Inc. <br /> The interim water improvements consist of the following four areas of work: <br /> 1) Turnout 4 Replacement and Booster Station <br /> 2) Stoneridge Drive 20-Inch Water Main (F-1 Line) <br /> 3) Bernal Avenue 18-Inch Water Main (F-4 Line) <br /> 4) Sunol Boulevard 20-Inch Water Main (F-7 Line) <br /> Improvements to -ALA <br /> T_ <br /> mitigate high pressures i s <br /> - TURNOUT.Mt ' f3 <br /> ,e Detail A "^ '3,800 gpm <br /> - - e•a.errnotE op�. <br /> m 'jA - TURNOUT 01 <br /> 2.750 gpm �3 TS'0 gpm <br /> �II811 <br /> VO <br /> wQ t r <br /> -oil 1 <br /> l <br /> &W LL7V W." IUS_ jj •��' <br /> t �Y ':TURNOUT lS�� <br /> s 11 B 7.000 gpm-9 000 gpm I <br /> Improvements to <br /> mitigate high headlosses <br /> GREV <br /> Improvements to A, Detall C' �;U'14 <br /> mitigate high pressures'—_—s r. <br /> and to balance tank <br /> levels <br /> ( N ^" i VINEYARD <br /> i r B04DE-2 <br /> KOTT:NGt R RANCH TANK <br /> c SYCAMORE TANK 41 <br /> t- r7�! a*,.-L'JNb.RANCH WA'ER'•ANK _ <br /> Figure 1 - Interim Water Improvements <br /> Page 4 of 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.