Laserfiche WebLink
JZ Woodard & Curran <br /> within 4 months from the date of the notice to proceed to the consultant. The technical <br /> memorandum including pump drawings, calculations,and specifications will be sent to multiple <br /> pump manufactures in 3 weeks from the date of the Notice to Proceed. <br /> RECOMMENDED SHEET LIST <br /> We will provide the recommended sheet list as a minimum. <br /> Drawing Number Description <br /> C-1 Title Sheet <br /> C-2 Vicinity Map, Location Map, Public Agencies&Utilities, Sheet Index <br /> C-3 General Notes,Abbreviations and Symbols, Bench Mark, Basis of Bearings <br /> C-4 Basis of Design <br /> C-5 Pump Station Location and Horizontal Control Plan <br /> C-6 Existing Demolition Plan(for Turnout) <br /> C-7 Pump Station Site Plan <br /> C-8 Grading and Paving Plan <br /> C-9 Pump Station Mechanical Plan and Sections <br /> C-10 Pipeline Plan(Sheet 1 of 5)Using GIS Basemap <br /> C-11 Pipeline Plan(Sheet 2 of 5)Using GIS Basemap <br /> C-12 Pipeline Plan(Sheet 3 of 5)Using GIS Basemap <br /> C-13 Pipeline Plan(Sheet 4 of 5)Using GIS Basemap <br /> C-14 Pipeline Plan(Sheet 5 of 5)Using GIS Basemap <br /> C-15 Miscellaneous Details <br /> C-16 Miscellaneous Details <br /> C-17 Miscellaneous Details <br /> E-1 Electrical Symbols List, Abbreviations, and Notes <br /> E-2 Single Line Diagram and Load Calculations <br /> E-3 Electrical Site Plan <br /> E-4 Power and Lighting <br /> E-5 Instrumentation Plans <br /> E-6 Pump Control Diagram <br /> E-7 Electrical Details <br /> 9 <br />