Laserfiche WebLink
Wood a rd & Cu rrra n <br /> E-8 Electrical Details <br /> I-1 Process and Instrumentation Diagram(Legend) <br /> 1-2 Process and Instrumentation Diagram(Legend) <br /> I-3 Process and Instrumentation Diagram(Turnout) <br /> I4 Process and Instrumentation Diagram(Pump Station) <br /> I-5 Instrumentation Details <br /> S-1 Structural Legend,Abbreviations,General Notes&Code Review <br /> S-2 Foundation Plan—Pump Station(PS) <br /> S-3 Partial Demolition Plan—Fluoride Building(FB) <br /> S-4 Fluoride Building(FB)Modifications <br /> S-5 Equipment Pad Plans and Details <br /> S-6 Details 1 <br /> S-7 Details 2 <br /> RECOMMENDED TECHNICAL SPECIFICATONS <br /> The following recommended `CSI'specification sections will be customized to this project.The old`CSI' <br /> numbering format will be used for this project. <br /> Proposed Specifications List <br /> Number Description <br /> 01010 Summary of Work <br /> 01011 General Requirements <br /> 01014 Work Sequence <br /> 01039 Coordination and Meetings <br /> 01300 Submittal Procedure <br /> 01360 Operating and Maintenance Information <br /> 01410 Testing and Inspection <br /> 01505 Mobilization <br /> 01540 Security <br /> 01560 Temporary Environmental Controls <br /> 01620 Protection of Materials and Equipment <br /> 01660 Installation,Testing,and Commissioning <br /> 01700 Project Closeout <br /> 01710 Final Cleanup <br /> 01720 Record Drawings <br /> 01760 Spare Parts and Maintenance Materials <br /> 10 <br />