My WebLink
|
Help
|
About
|
Sign Out
16
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2023
>
081523 SPECIAL
>
16
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/9/2023 2:47:36 PM
Creation date
8/9/2023 2:47:12 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
8/15/2023
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
J0?_0 Woodard & Curran <br /> APPROACH <br /> Our approach includes,but is not limited to the following tasks: <br /> 1. Woodard&Curran will evaluate and document the following key design issues: <br /> • Pump Type and Sizing(including Number of Pumps) <br /> • Coordinate Pre-packaged Pump Selection and Specifications with Pump Manufacturers <br /> including,but not limited to the following: <br /> o Xylem <br /> o Pentair <br /> o Grundfos <br /> o Sulzer <br /> o Trillium <br /> o Flowserve <br /> • Flow and Hydraulics <br /> • Topographic Design Survey—Field and Office Work for the existing Turnout Site(Booster <br /> Pump Station) <br /> • Aerials and GIS Data will be used for the Discharge Piping Plan Views <br /> • Utilities Research for Pump Station and Pipeline <br /> • Pump Station Hydraulic Calculations and Analysis <br /> • Transient Analysis <br /> • Backup Generator Sizing(Portable) <br /> • New Electrical Service(if required) <br /> • Preliminary and Final Technical Memorandum(Basis of Design) <br /> • Front End Documents Preparation <br /> • Special Provisions Preparation(CSI Technical Specifications) <br /> o One Package for the Procurement of the Package Pump Station <br /> o Second Package for the Construction Bid Documents <br /> • Complete Design Drawings Package Including the Following: <br /> o Basis of Design <br /> o Civil <br /> o Mechanical <br /> o Pipeline Sheets <br /> o Electrical <br /> o Instrumentation <br /> o Structural <br /> 2. Hydraulic calculations will be included and substantiated for the new booster pump station that <br /> will convey potable water to the Foothill Reservoir,which is 8 million gallons in capacity.The <br /> modeling for various scenarios will be done by AEG. <br /> 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.