Laserfiche WebLink
J?$� Woodard & Curran <br /> • Potholing By T-2(allowance) <br /> Task 3 Deliverables: <br /> Plans, Specifications and Cost Estimates will be provided in PDF format for the following submittals: <br /> - 60%, 90%,and 100% Submittals <br /> Task 3 Assumptions: <br /> - Assumes City to provide front end documents(template)for use on this project. <br /> - City review time for each submittal is estimated at 1 week from time of submittal. <br /> - Pipeline design will include plan view only based on GIS data, no profiles for this project. <br /> - CSI specifications based on old format and Woodard&Curran standard sections. <br /> See proposed specifications list in Approach section. <br /> - Assume survey and geotechnical services will be initiated directly after the Notice to Proceed. <br /> - Schedule assumptions are provided in the Approach section. <br /> - Assumes pump performance specifications will be sent to four(4)manufacturers. <br /> - Contact with jurisdictional agencies are assumed to be provided by the City of Pleasanton <br /> - Zone 7 coordination will be included to determine standards and conditions to which new turnout <br /> will be constructed. <br /> - No environmental permitting is provided and is assumed to be provided by others or under <br /> separate scope and fee. <br /> - Traffic control design for construction is not included. It is assumed that traffic control will be <br /> provided with performance specifications to be implemented by the contractor. <br /> - The F1 discharge pipeline material is assumed to be PVC or Ductile Iron Pipe <br /> - Construction support services are not included. <br /> - Easements, property acquisitions and negotiations are not included and is assumed to be provided <br /> by others <br /> - Assumes City to provide record(asbuilt)plans for the Fluoride building. <br /> - City will coordinate with PG&E on the project. <br /> 6 <br />