My WebLink
|
Help
|
About
|
Sign Out
16
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2023
>
081523 SPECIAL
>
16
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/9/2023 2:47:36 PM
Creation date
8/9/2023 2:47:12 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
8/15/2023
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Woodard & Curran <br /> Task 2.3-Pump Specifications for Procurement <br /> Woodard & Curran will provide a pump specification for the City's pre-procurement of pre-package <br /> pump station. This information will include pre-package lift station design parameters, and a <br /> performance specification that will be used to procure equipment necessary for the system. This will <br /> include pumps, valves and enclosures. Up to 4 Pre-package pump station manufacturers will be <br /> contacted. <br /> Task 2.4-Preliminary Technical Memorandum(Basis of Design) <br /> Woodard& Curran will provide a technical memorandum summarizing the design approach for the pre- <br /> package booster pump station and FI pipeline. This will include preliminary pump station siting and <br /> waterline alignment routing options along Stoneridge drive. This document will service as a basis of <br /> design for the 60%design plans. A workshop will be conducted ahead of submittal to discuss its contents <br /> and any comments received from the basis of design technical memorandum will be incorporated into the <br /> 60%, 90% and final contract documents (no final TM will be provided). The efforts included in the <br /> development of the preliminary design technical memorandum include but are not limited to the <br /> following: <br /> • Coordination with Akel Engineering Group for hydraulic conditions and constraints <br /> • Pump station hydraulic calculations <br /> • Structural requirements for anchorage of pre-package enclosures or structures <br /> • Site visits for the team <br /> • Preliminary cost estimates <br /> • Pipeline alignment corridor options and recommendations <br /> • Summary of utility research <br /> • Electrical load requirements <br /> Task 2 Deliverables: <br /> - Technical Design Memorandum in PDF and Native electronic format. <br /> - Vendor information and cut sheets <br /> - Preliminary Cost Estimate <br /> - Pipeline alignment cross section options <br /> Task 2 Assumptions: <br /> - Contact with jurisdictional agencies is assumed to be provided by the City. <br /> - Zone 7 coordination will be included to determine standards and conditions to which new turnout <br /> will be constructed. <br /> - Technical memorandum will be provided in memo format at 15-25 pages in length with <br /> supporting materials. <br /> - Hydraulic modeling of the system is provided by AEG(not included in scope of work). <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.