Turnout 4 Replacement and Booster Station and Stoneridge Drive 24-Inch Potable <br /> Water Main (F-1 Line) Project, CIP No. 24171, in the amount of $666,365. <br /> 2. Approve and authorize the City Manager to execute a professional services <br /> agreement with Pakpour Consulting Group, Inc. for civil engineering services for the <br /> design of 1 ,600 linear feet of 18-inch water main on Bernal Avenue for the Bernal <br /> Avenue 18-Inch Potable Main (F-4 Line) Project, CIP No. 24172, in the amount of <br /> $121,216. <br /> 3. Approve and authorize the City Manager to execute a professional services <br /> agreement with Mark Thomas & Company, Inc. for civil engineering services for the <br /> design of 4,500 linear feet of 20-inch water main on Sunol Boulevard for the Sunol <br /> Boulevard 20-Inch Potable Water Main (F-7 Line) Project, CIP No. 24173, in the <br /> amount of$231,906. <br /> 4. Authorize the City Manager to approve and execute contract amendment(s) for a <br /> design project contingency amount of $100,000 (approximately 10 percent of the <br /> design professional services agreements) for unforeseen yet necessary related <br /> work. <br /> 5. Transfer $180,426 from the Annual Water Distribution System Improvements, CIP <br /> No. 23183, to the Turnout 4 Replacement and Booster Station and Stoneridge Drive <br /> 24-Inch Potable Water Main (F-1 Line) Project, CIP No. 24171, to fund the design, <br /> including contingency. <br /> 6. Transfer $551,061 from the Annual Water Distribution System Improvements, CIP <br /> No. 24183, to the Turnout 4 Replacement and Booster Station and Stoneridge Drive <br /> 24-Inch Potable Water Main (F-1 Line) Project, CIP No. 24171, to fund the design, <br /> including contingency. <br /> 7. Transfer $133,000 from the Annual Water Distribution System Improvements, CIP <br /> No. 24183, to the Bernal Avenue 18-Inch Potable Water Main (F-4 Line) Project, CIP <br /> No. 24172, to fund the design, including contingency. <br /> 8. Transfer $255,000 from the Annual Water Distribution System Improvements, CIP <br /> No. 24183, to the Sunol Boulevard 20-Inch Potable Water Main (F-7 Line) Project, <br /> CIP No. 24173, to fund the design, including contingency. <br /> FINANCIAL STATEMENT <br /> The total design expenditures for the interim water improvements, including a 10 <br /> percent design contingency, is $1 ,119,487 and are recommended to be funded from <br /> both Annual Water Distribution System Improvements Projects, CIP No. 23183 and CIP <br /> No. 24183. The combined CIP funding provides $2 million; the total expenditures are <br /> $1,939,060, which includes work performed by DPI, Inc., the Rain for Rent pump rental <br /> and the design costs for the interim water improvements (see Attachment 1). Three new <br /> CIP projects are recommended to be developed and funded as outlined in the <br /> recommendations above. Due to the accelerated schedule to develop the scope of <br /> work, a 10 percent design contingency for each professional design services agreement <br /> Page 2 of 10 <br />