My WebLink
|
Help
|
About
|
Sign Out
16
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2023
>
051623
>
16
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/10/2023 3:45:48 PM
Creation date
5/10/2023 3:45:47 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
5/16/2023
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
screening will be evaluated in further detail, based on the criteria developed, are <br /> provided in the table below. <br /> Shortlisted Alternatives <br /> Alternatives Pros Cons <br /> Maintain Groundwater Pumping Allotment <br /> A. Modified PFAS • Cost: Less expensive • Reliability: Lack of well <br /> Treatment & Well than baseline supply redundancy and <br /> Rehab Project (Well 8 reduced peaking ability <br /> Only) vs. baseline <br /> B. New City Wells Outside • Cost: Less expensive • Water Quality: Potential <br /> PFAS Plume (west side than baseline for contaminant <br /> of City) • Operations: No near- mobilization (long-term) <br /> term PFAS treatment • Timing of <br /> Implementation: Longer <br /> implementation due to <br /> well locating and <br /> permitting <br /> C. Zone 7 Pump on City's . Cost: Potential cost Institutional Complexity <br /> Behalf (w/ new sharing / economy of & Timing of <br /> infrastructure) scale if can provide Implementation: <br /> regional benefits Dependent on findings / <br /> • Operations: Zone 7 schedule / approval of <br /> performs O&M Zone 7's groundwater <br /> planning efforts <br /> D. Regional PFAS • Cost: Potential cost Institutional Complexity <br /> Treatment Facility sharing /economy of & Timing of <br /> (located at Pleasanton scale if can provide Implementation: <br /> OSC) regional benefits Dependent on findings / <br /> • Operations: Zone 7 schedule / approval of <br /> performs O&M Zone 7's groundwater <br /> planning efforts <br /> Other Supply Sources <br /> A. 100% Wholesale • Operations: No Well • Institutional Complexity: <br /> Purchases from Zone 7 O&M required Zone 7 commitment to <br /> • Timing of long-term supply <br /> Implementation: • Reliability: Dry year <br /> Potentially quicker uncertainty; limited <br /> dependent on scope of redundancy & peaking <br /> Zone 7 needed ability w/out wells <br /> improvements. Cost: Potential new <br /> Zone 7 infrastructure <br /> required; wholesale <br /> rate escalations <br /> Page 3 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.