Laserfiche WebLink
4. Alternatives Evaluation IN PROGRESS <br /> Task 4, which includes most of the technical work to be performed during this study, is <br /> underway. BC refined the evaluation criteria based on feedback from the Water Ad Hoc <br /> Subcommittee and confirmed the criteria with the subcommittee in January 2023. BC <br /> worked with the subcommittee to assign relative weights to the criteria and develop a <br /> scoring rubric that will be used for scoring the alternatives. <br /> Task 4 is focused on deeper technical analysis of the alternatives (e.g., groundwater <br /> modeling to estimate long-term yield and water quality and coordination with City's <br /> hydraulic model to estimate ability to distribute future maximum day demands) to further <br /> scope the alternatives, score them against the evaluation criteria, and prepare <br /> preliminary cost estimates. Once this information is developed, BC will prioritize the <br /> alternatives and the preferred alternative will be recommended. <br /> 5. Recommendations and Report TO BE COMPLETED <br /> BC will present potential project delivery models for design, construction, operation and <br /> maintenance, financing, and ownership of the preferred alternative from Task 4 and <br /> make a recommendation. BC will prepare draft and final reports summarizing the work <br /> performed, presenting the results of the alternatives evaluation, and including an <br /> implementation plan for the preferred alternative that includes the recommended project <br /> delivery model, major tasks, and milestone schedule. <br /> 6. Council Meetings and Engagement IN PROGRESS <br /> BC to attend monthly Water Ad Hoc Subcommittee meetings and coordinate with City <br /> staff to prepare for meetings, including preparation of slides. BC to attend City Council <br /> meetings quarterly and coordinate with City staff to prepare for meetings, including <br /> development of slides. This task also includes support of relevant public engagement <br /> efforts, such as addressing public comments and questions raised during subcommittee <br /> or City Council meetings, as appropriate. <br /> Upcoming Next Steps: <br /> • Complete technical analysis of alternatives (June 2023) <br /> • Score alternatives against evaluation criteria (July 2023) <br /> • Perform sensitivity analysis (July 2023) <br /> • Finalize cost estimates (July 2023) <br /> • Identify preferred alternative and implementation strategy (August 2023) <br /> • Prepare draft and final report (September 2023) <br /> Submitted by: Fiscal Review: Approved by: <br /> Tamara Baptista Susan Hsieh Gerry Beaudin <br /> Interim Director of Operations Finance Director City Manager <br /> and Water Utilities <br /> Page 4 of 4 <br />