My WebLink
|
Help
|
About
|
Sign Out
06C
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2023
>
042023 JOINT PUSD
>
06C
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2023 1:46:05 PM
Creation date
4/14/2023 1:45:53 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
4/20/2023
DESTRUCT DATE
20Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
construction cost. With the need to reconstruct the curb <br /> and gutter as part of the roadway reconstruction, the <br /> overall cost to the pedestrian and bicycle project is <br /> reduced making this design alternative feasible. <br /> Preliminary design is underway with anticipated <br /> completion in 18 months (spring of 2024), with <br /> construction to follow in the summer of 2024. <br /> • Applicant: City of Pleasanton <br /> • Staff Contact(s): Mike Tassano <br /> 33. Overcrossing Improvement Transportation/Traffic Project <br /> Plan for Pedestrians and <br /> Bicycles <br /> City Council at its September 13, 2016 meeting awarded the Freeway Overcrossing <br /> Improvement Plan project. This plan identified needed improvements and an <br /> implementation strategy to improve bicycle and pedestrian facilities at the freeway <br /> overcrossings. Included with project deliverables is a set of plans for each overcrossing <br /> that will be used for future construction. The were completed and presented to City <br /> Council in December of 2018. <br /> • Status Completed <br /> • Next Steps/Details: Staff conducted additional operational analysis on the <br /> proposed overcrossing design. Locations where peak <br /> vehicle on ramp volumes were/are in excess of 800 <br /> vehicles operated poorly under the proposed design <br /> conditions (queue spillback into adjacent intersections). <br /> Staff will implement a 2 phase approach, constructing the <br /> design features that do not impact vehicle operations with <br /> overlay projects and look for grant funding to provide <br /> controlled pedestrian and bicycle crossing at the 800+ <br /> vehicle ramp locations. The City was awarded grant <br /> money to construct this project. <br /> It is expected that the full construction plans will be <br /> available for review in the Spring of 2023 and <br /> construction possible upon Caltrans approval possibly in <br /> the Fall of 2023. <br /> • Applicant: City of Pleasanton <br /> • Staff Contact(s): Mike Tassano <br /> TRAFFIC OPERATIONS <br /> 34. Sunol Boulevard Transportation/Traffic Project <br /> Interchange <br /> The Sunol Boulevard Interchange is in the Caltrans Right of Way,but any improvements <br /> to local interchanges are funded by the local agency. The City issued a request for <br />
The URL can be used to link to this page
Your browser does not support the video tag.