Laserfiche WebLink
Staff completed an analysis of how the proposed project is consistent with or <br /> implements the applicable measures outlined in the City's CAP 2.0. As a large <br /> residential project located near a BART station and several commuter bus lines, the <br /> proposed project is consistent with Land Use Goal 1 of the CAP: to reduce vehicle miles <br /> traveled (VMT) through infill and higher density development. The project will also <br /> incorporate bicycle racks/storage for residents that utilize alternative commutes and will <br /> provide alternative vehicle parking spaces including some with electric vehicle charging <br /> stations. In addition, several CAP strategies and supporting actions related to water and <br /> energy conservation are implemented in the proposed project, including the proposed <br /> building would be all electric and not contain any new gas facilities, or are required as <br /> conditions of approval. <br /> Accessibility and Universal Design <br /> Accessibility requirements for private development residential projects are reflected in <br /> the California Building Code (CBC), Chapter 11A. Chapter 11A requirements are <br /> applicable to apartment buildings with three or more units, or condominiums with four or <br /> more units. The proposed project is a "covered project" as defined in Chapter 11A and <br /> therefore, required to be designed as 'adaptable,' which is defined in the CBC as <br /> "designed with elements and spaces allowing the unit to be adapted or adjusted to <br /> accommodate the user." The CBC does not require covered units to be fully accessible <br /> to a person with a disability, rather it must be designed in such a manner that it can be <br /> easily adapted or modified for a person with a disability requiring accessible features. <br /> Although the City does not have an ordinance mandating Universal Design, the City has <br /> been successful in negotiating enhanced accessibility features, or universal design <br /> features, in apartment projects. <br /> Recently approved apartment projects (St. Anton, California Center, BRE Properties <br /> and Windstar's PUD extension) were conditioned to provide universal design features <br /> for all the required adaptable dwelling units. Staff has included a similar condition of <br /> approval for this project that requires all the units to include additional universal design <br /> features. In addition, a minimum of one unit for each bedroom type offered and a <br /> minimum of five percent of all units required to be adaptable shall provide a roll-in <br /> shower. This results in 18 units for this project shall provide a roll-in shower. <br /> School Impacts <br /> The project developer has been working with the Pleasanton Unified School District to <br /> develop an agreement regarding school impact fees. Pursuant to State law, payment of <br /> school impact fees set by the state legislature is deemed adequate mitigation for <br /> school-related impacts associated with new student generation. Construction will not be <br /> allowed to start until Pleasanton Unified School District has advised that such <br /> agreement has been finalized with the project developer and required fees paid. <br /> Tree Removal and Landscaping <br /> A tree report has been prepared that specifies the species, size, health, and value of the <br /> existing trees on the site that exceed six inches in diameter. There are approximately <br /> Page 37 of 41 <br />