Laserfiche WebLink
AUGUSTIN BERNAL MOUNTAIN BIKE TRAIL PROJECT DRAFT INITIAL STUDY <br /> 12956 <br />DUDEK 6 April 2022 <br />Table 2-1. Mitigation Measures <br />Measure <br />Number Measure Text <br /> Best management practices for spill prevention shall be incorporated into <br />project plans and specifications and shall contain measures for secondary <br />containment and safe handling procedures. <br /> A spill kit shall be maintained on site throughout all construction activities and <br />shall contain appropriate items to absorb, contain, neutralize, or remove <br />hazardous materials stored or used in large quantities during construction. <br /> Project plans and specifications shall identify construction staging areas and <br />designated areas where equipment refueling, lubrication, and maintenance <br />may occur. Areas designated for refueling, lubrication, and maintenance of <br />equipment shall be approved by the City. <br /> In the event of any spill or release of any chemical or wastewater during <br />construction, the contractor shall immediately notify the City of Pleasanton. <br /> Hazardous substances shall be handled in accordance with Title 22 of the <br />California Code of Regulations, which prescribes measures to appropriately <br />manage hazardous substances, including requirements for storage, spill <br />prevention and response and reporting procedures. <br /> <br />