Laserfiche WebLink
AUGUSTIN BERNAL MOUNTAIN BIKE TRAIL PROJECT DRAFT INITIAL STUDY <br /> 12956 <br />DUDEK 7 April 2022 <br />3 Initial Study Checklist <br />Project Title: <br />Augustin Bernal Mountain Bike Trail Project <br />Lead Agency: <br />City of Pleasanton <br />200 Old Bernal Avenue <br />Pleasanton, CA 94566 <br /> <br />Contact: Matt Gruber, City Landscape Architect; Engineering Department <br />Phone: 925.931.5672 <br />Email: mgruber@cityofpleasantonca.gov <br /> <br />Project Sponsor: <br />City of Pleasanton <br />200 Old Bernal Avenue <br />Pleasanton, CA 94566 <br /> <br />Project Summary: <br />Replace an unauthorized, user-created mountain bike trail within the Augustin Bernal Community Park with a formal <br />City-created downhill-only technical mountain bike trail and decommission other user-created trails. A portion of the <br />new trail would cross land owned by the Golden Eagle Homeowner’s Association between Augustin Bernal <br />Community Park and the Agustin Bernal Community Park staging area and parking lot, at the end of Golden Eagle <br />Way, subject to the Homeowner’s Association granting of an access easement. <br />Project Location: <br />As shown in Figure 1, Regional Location, the project site is within and adjacent to the Augustin Bernal Community <br />Park, which is a 237-acre park located in the southwestern portion of the City of Pleasanton. The project site is <br />located in the southern portion of the park, east of the Castlewood Country Club. As shown in Figure 2, Project <br />Vicinity, the trail begins between the northern and southern portions of Pleasanton Ridge Regional Park and ends <br />at the Augustin Bernal Community Park staging area parking lot, at the end of Golden Eagle Way. The project site <br />is located in Section 31, Township 3 South, Range 1 East, of the “Dublin” U.S. Geological Survey 7.5-minute <br />quadrangle.