My WebLink
|
Help
|
About
|
Sign Out
3_Exhibit C_ADDENDUM ONLY
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
AGENDA PACKETS
>
2020 - PRESENT
>
2023
>
02-22
>
3_Exhibit C_ADDENDUM ONLY
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2023 2:21:14 PM
Creation date
2/17/2023 2:20:08 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
12/22/2023
DESTRUCT DATE
15Y
Document Relationships
3
(Message)
Path:
\BOARDS AND COMMISSIONS\PLANNING\AGENDA PACKETS\2020 - PRESENT\2023\02-22
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
197
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of Pleasanton—Stoneridge Mall Residential Project <br />CEQA Checklist Section 15183 Checklist/15164 Addendum <br /> <br /> <br />174 FirstCarbon Solutions <br />Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2148/21480017/Consistency Checklist/21480017 Stoneridge Mall Residential Project Checklist <br />Addendum_Updated.docx <br />Environmental Issue <br />Area <br />Conclusion in <br />Prior EIR <br />Are there <br />Project <br />Impacts <br />Described in <br />15183? <br />Are there <br />Proposed <br />Changes <br />Involving New <br />or More <br />Severe <br />Impacts? <br />(15162) <br />Are there New <br />Circumstances <br />Involving New <br />or More <br />Severe <br />Impacts? <br />(15162) <br />Is there New <br />Information <br />Involving New <br />or More <br />Severe <br />Impacts <br />(15162)? <br />Mitigation <br />Measures <br />XVIII. Utilities and Service Systems <br />Would the project: <br />a) Require or result in <br />the relocation or <br />construction of new <br />or expanded water, <br />wastewater <br />treatment or <br />stormwater <br />drainage, electric <br />power, natural gas, <br />or <br />telecommunications <br />facilities, the <br />construction or <br />relocation of which <br />could cause <br />significant <br />environmental <br />effects? <br />Less than <br />significant <br />with <br />mitigation <br />incorporated <br />No No No No MM 4.L-2 <br />b) Have sufficient <br />water supplies <br />available to serve <br />the project and <br />reasonably <br />foreseeable future <br />development during <br />normal, dry and <br />multiple dry years? <br />Less than <br />significant <br />with <br />mitigation <br />incorporated <br />No No No No MM 4.L-2 <br />c) Result in a <br />determination by <br />the wastewater <br />treatment provider <br />which serves or may <br />serve the project <br />that it has adequate <br />capacity to serve <br />the project’s <br />projected demand <br />in addition to the <br />provider’s existing <br />commitments? <br />Less than <br />significant <br />impact <br />No No No No None
The URL can be used to link to this page
Your browser does not support the video tag.