My WebLink
|
Help
|
About
|
Sign Out
3_Exhibit C_ADDENDUM ONLY
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
AGENDA PACKETS
>
2020 - PRESENT
>
2023
>
02-22
>
3_Exhibit C_ADDENDUM ONLY
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2023 2:21:14 PM
Creation date
2/17/2023 2:20:08 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
12/22/2023
DESTRUCT DATE
15Y
Document Relationships
3
(Message)
Path:
\BOARDS AND COMMISSIONS\PLANNING\AGENDA PACKETS\2020 - PRESENT\2023\02-22
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
197
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of Pleasanton—Stoneridge Mall Residential Project <br />Section 15183 Checklist/15164 Addendum CEQA Checklist <br /> <br /> <br />FirstCarbon Solutions 151 <br />Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2148/21480017/Consistency Checklist/21480017 Stoneridge Mall Residential Project Checklist <br />Addendum_Updated.docx <br />1. Foothill Road north of Canyon Way (project’s share is 1.65 percent) <br />2. Foothill Road south of Canyon Way (project’s share is 0.81 percent) <br />3. Canyon Way east of Foothill Road (project’s share is 2.16 percent) <br />4. Springdale Avenue north of Stoneridge Drive (project’s share is 0.33 percent) <br />5. Springdale Avenue east of Springdale Avenue (project’s share is 0.15 percent) <br />6. Stoneridge Mall Road north of Stoneridge Drive (project’s share is 3.42 percent) <br />7. Stoneridge Drive east of Stoneridge Mall Road (project’s share is 1.69 percent) <br />8. Stoneridge Drive west of Stoneridge Mall Road (project’s share is 0.15 percent) <br /> <br />Implementation Measure 2 Traffic Noise Exceedance Reduction Measure <br />MM 4.J-5c. shall be implemented as follows: the project shall include construction of <br />a barrier along the north and east sides of the northeastern level 4 rooftop deck. <br />The barriers should run the length of the east and north edges of the rooftop deck, <br />be at least 6 feet high, have a minimum surface weight of 3 pounds per square foot, <br />and have no cracks or gaps. Glass or another transparent material can be used. With <br />the barrier in place, traffic noise levels would be reduced to below 65 dBA Ldn at the <br />northeast rooftop deck Level 4. <br />Conclusion <br />With implementation of the relevant Prior EIR mitigation measures as specified above, project- <br />related traffic noise increase impacts and traffic noise exceedances at the proposed rooftop active <br />on-site outdoor use area would remain less than significant.
The URL can be used to link to this page
Your browser does not support the video tag.