Laserfiche WebLink
City of Pleasanton—Stoneridge Mall Residential Project <br />CEQA Checklist Section 15183 Checklist/15164 Addendum <br /> <br /> <br />136 FirstCarbon Solutions <br />Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2148/21480017/Consistency Checklist/21480017 Stoneridge Mall Residential Project Checklist <br />Addendum_Updated.docx <br />individual development projects would be integrated into the established local communities, rather <br />than creating divisions. In addition, the Prior EIR highlighted Policy 35 and Program 35.1 of the <br />Housing Element as components that would prevent community division. Therefore, the Prior EIR <br />found there to be a less than significant impact regarding the division of established communities. <br />Analysis of Proposed Project <br />The types of barriers or physical features that can divide a community include roads, freeways, <br />railroads, transit lines, and open space that is not developed for recreational use. The project site is <br />currently developed with an asphalt park and is surrounded by commercial uses. Therefore, the <br />proposed project would not interfere with any existing residential community. Additionally, the <br />redevelopment of the project site would not divide an established community. The Housing Element <br />originally planned for the project site to hold up to 400 units on the entirety of Site 3. The proposed <br />project would develop 360 units on approximately 6 acres of Site 3 in compliance with the applicable <br />density bonus. Therefore, the proposed project would match the Housing Element’s intended land <br />use intensity for the site. As such, impacts would continue to be less than significant, and no <br />mitigation is necessary, consistent with the Prior EIR. There are no proposed changes, new <br />circumstances, or new information that would cause new or more severe impacts. <br />Therefore, there are no environmental effects that are peculiar to the proposed project or the <br />parcels on which the proposed project would be located. Impacts would be less than significant and <br />the proposed project would not result in a new or more severe adverse impact that was not <br />previously identified in the Prior EIR. <br />b) Land Use Plan, Policy, or Regulation <br />Prior EIR Conclusions <br />The Prior EIR concluded that the Housing Element is consistent with General Plan policies that <br />encourage infill, mixed-use, and transit-oriented development as well as higher density residential <br />development that supports affordable housing near transit and transportation corridors and <br />downtown. It also determined consistency with Program 18.2 of the General Plan, which encourages <br />land use flexibility for the Hacienda Business Park and Stoneridge Mall to help accommodate the <br />Regional Housing Needs Allocation requirements. The Housing Element envisioned up to 400 units at <br />Site 3, which includes the project site. Based on this information, the Prior EIR concluded that <br />impacts would be less than significant. <br />Analysis of Proposed Project <br />The project site is in the PUD–Mixed-Use land use and zoning designation. The Mixed-Use <br />designation allows any combination of business park, office, retail, hotel and other commercial uses, <br />community facilities, research and development, and residential uses in a single building, on a single <br />site, or on adjacent sites where the uses are integrated and include a functional interrelationship and