Laserfiche WebLink
<br />Revised July 2022 Page 5 of 10 <br /> <br />Building Electrification <br />CAP 2.0 <br />(P1) <br />New <br />Construction <br />10. All-Electric. Will the Project be all-electric (i.e., does <br />not include any new gas infrastructure), including <br />lighting, heating, cooking, and water heating? <br />Yes☐ <br />No☐ <br />N/A☐ <br />_____________________ <br />_____________________ <br />_____________________ <br />CAP 2.0 <br />(P2) <br />Additions and <br />Renovations <br />11. All-Electric Existing Buildings. Will the Project <br />upgrade existing residential and commercial buildings to <br />be all-electric (e.g., air source heat pumps, heat pump <br />water heaters, electric dryers, and induction stoves)? <br />Rebates may be available. Voluntary <br />Yes☐ <br />No☐ <br />N/A☐ <br />_____________________ <br />_____________________ <br />_____________________ <br />_____________________ <br />CAP 2.0 <br />(S1) All Projects <br />12. Refrigerant Management. If new heating, <br />ventilation, and air conditioning (HVAC) systems are <br />being installed, does the project incorporate the lowest <br />global warming potential (GWP) refrigerants for HVAC <br />systems? Voluntary <br />Yes☐ <br />No☐ <br />N/A☐ <br />_____________________ <br />_____________________ <br />_____________________ <br />_____________________ <br />