My WebLink
|
Help
|
About
|
Sign Out
3_Exhibit B
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
AGENDA PACKETS
>
2020 - PRESENT
>
2023
>
02-22
>
3_Exhibit B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/16/2023 1:15:46 PM
Creation date
2/16/2023 1:06:44 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
2/22/2023
DESTRUCT DATE
15Y
Document Relationships
3
(Message)
Path:
\BOARDS AND COMMISSIONS\PLANNING\AGENDA PACKETS\2020 - PRESENT\2023\02-22
Jump to thumbnail
< previous set
next set >
Text box
ID:
1
Creator:
PLAN1
Created:
2/16/2023 1:15 PM
Modified:
2/16/2023 1:15 PM
Text:
See note page 3
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
248
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Revised July 2022 Page 6 of 10 <br /> <br />Vehicle Electrification <br />CAP 2.0 <br />(P5) <br />New <br />Construction <br />13. EV Charging. Will the Project install electric vehicle <br />charging infrastructure as follows: <br />• SFR: One Level 2 EV Ready2 space and one <br />Level 1 EV Ready per unit. <br />• ADU: One Level 1 EV Ready space per unit <br />(where parking is provided). <br />• Multi-family: 15-percent of dwelling units shall <br />provide one Level 2 EVCS3 space, and 85-percent <br />of dwelling units shall provide one Level 2 EV <br />Ready4. <br />• Offices: 20-percent of required parking spaces <br />shall be Level 2 EVCS, and 30-percent shall be <br />Level 2 EV Capable5. <br />• All other non-residential: 10-percent of parking <br />spaces shall be Level 2 EVCS, and 10-percent <br />shall be Level 2 EV Capable. <br />Indicate the plan sheet(s) where EV Charging <br />information is provided. <br />Yes☐ <br />No☐ <br />N/A☐ <br />_____________________ <br />_____________________ <br />_____________________ <br />_____________________ <br />_____________________ <br />_____________________ <br />_____________________ <br />_____________________ <br />_____________________ <br />_____________________ <br /> <br /> <br />2 EV Ready includes: Installation of raceway, adequate panel capacity, dedicated branch circuit, circuit breaker, and electrical components (e.g., 240-volt outlet). Level 2 must be capable of 8.3 kVa (208/240 volt, 40 amp), <br />Low Level 2 must be capable of 4.1 kVA (208/240 volt, 20 amp), and Level 1 must a minimum of 2.2 kVa (110/120 volt, 20-amp). <br />3 EVCS includes: Installation of raceway, adequate panel capacity, dedicated branch circuit, circuit breaker, and electrical components (e.g., 240-volt outlet). and vehicle supply equipment. <br />4 Five Level 2 and/or Level 1 spaces can be substituted for each direct current fast charging (DCFC) station provided (i.e., a DCFC is a minimum of 48 kVA- 480 volt, 100-amp). <br />5 EV Capable includes: Conduit installed and adequate panel capacity installed to accommodate future installation of a dedicated circuit and charging station.
The URL can be used to link to this page
Your browser does not support the video tag.