Laserfiche WebLink
<br />Revised July 2022 Page 4 of 10 <br /> <br />Energy <br />Energy Efficiency <br />CAP 2.0 <br />(S2) <br />Additions and <br />Renovations <br />6. Energy Efficiency Upgrades. Will the Project install <br />energy efficient window upgrades, LED lighting, and <br />other efficiency upgrades. Rebates and financing may be <br />available. Voluntary <br />Yes☐ <br />No☐ <br />N/A☐ <br />_____________________ <br />_____________________ <br />_____________________ <br />_____________________ <br />Renewable Energy <br />CAP 2.0 <br />(P4) <br />Covered <br />Projects <br />7. Solar. Will the Project include installation of a solar PV <br />system at time of new construction that meets the power <br />needs of the new building? Indicate the plan sheet(s) <br />where solar information is provided. <br />Yes☐ <br />No☐ <br />N/A☐ <br />_____________________ <br />_____________________ <br />_____________________ <br />_____________________ <br />CAP 2.0 <br />(P4) <br />Covered <br />Projects <br />8. Energy Storage System. When solar is being <br />installed, will the Project include a battery storage back- <br />up system? Indicate the plan sheet(s) where battery <br />storage information is provided. <br />Yes☐ <br />No☐ <br />N/A☐ <br />_____________________ <br />_____________________ <br />_____________________ <br />_____________________ <br />CAP 2.0 <br />(P4) All Projects <br />9. Water Heater. If a new water heater is being installed, <br />will the Project include installation of a solar water <br />heater? Voluntary <br />Yes☐ <br />No☐ <br />N/A☐ <br />_____________________ <br />_____________________ <br />_____________________ <br />_____________________ <br />