My WebLink
|
Help
|
About
|
Sign Out
3_Exhibit B
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
AGENDA PACKETS
>
2020 - PRESENT
>
2023
>
02-22
>
3_Exhibit B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/16/2023 1:15:46 PM
Creation date
2/16/2023 1:06:44 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
2/22/2023
DESTRUCT DATE
15Y
Document Relationships
3
(Message)
Path:
\BOARDS AND COMMISSIONS\PLANNING\AGENDA PACKETS\2020 - PRESENT\2023\02-22
Jump to thumbnail
< previous set
next set >
Text box
ID:
1
Creator:
PLAN1
Created:
2/16/2023 1:15 PM
Modified:
2/16/2023 1:15 PM
Text:
http://www.cityofpleasantonca.gov/gov/depts/os/env/energy_and_sustainability.asp
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
248
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Revised July 2022 Page 4 of 10 <br /> <br />Energy <br />Energy Efficiency <br />CAP 2.0 <br />(S2) <br />Additions and <br />Renovations <br />6. Energy Efficiency Upgrades. Will the Project install <br />energy efficient window upgrades, LED lighting, and <br />other efficiency upgrades. Rebates and financing may be <br />available. Voluntary <br />Yes☐ <br />No☐ <br />N/A☐ <br />_____________________ <br />_____________________ <br />_____________________ <br />_____________________ <br />Renewable Energy <br />CAP 2.0 <br />(P4) <br />Covered <br />Projects <br />7. Solar. Will the Project include installation of a solar PV <br />system at time of new construction that meets the power <br />needs of the new building? Indicate the plan sheet(s) <br />where solar information is provided. <br />Yes☐ <br />No☐ <br />N/A☐ <br />_____________________ <br />_____________________ <br />_____________________ <br />_____________________ <br />CAP 2.0 <br />(P4) <br />Covered <br />Projects <br />8. Energy Storage System. When solar is being <br />installed, will the Project include a battery storage back- <br />up system? Indicate the plan sheet(s) where battery <br />storage information is provided. <br />Yes☐ <br />No☐ <br />N/A☐ <br />_____________________ <br />_____________________ <br />_____________________ <br />_____________________ <br />CAP 2.0 <br />(P4) All Projects <br />9. Water Heater. If a new water heater is being installed, <br />will the Project include installation of a solar water <br />heater? Voluntary <br />Yes☐ <br />No☐ <br />N/A☐ <br />_____________________ <br />_____________________ <br />_____________________ <br />_____________________ <br />
The URL can be used to link to this page
Your browser does not support the video tag.