Laserfiche WebLink
<br />Revised July 2022 Page 3 of 10 <br /> <br />Regulation Project Type Requirements Compliance Required Explanation <br />Land Use <br />Green Building Standards <br />CALGreen <br />Code <br />New <br />Construction <br />and Additions <br />3. Green Building. Will the Project comply with the <br />latest version of mandatory measures in the <br />CALGreen Code (non-residential and residential)? <br />The CALGreen checklist is required at Building <br />Permit submittal. <br />Yes☐ <br />No☐ <br />N/A☐ <br />_____________________ <br />_____________________ <br />_____________________ <br />_____________________ <br />Municipal Code Covered <br />Projects1 <br />4. Green Building. Will the Project comply with the <br />Pleasanton Municipal Code Chapter 17.50 including <br />achieving LEED certification or achieving a “green <br />home” rating with Build It Green as detailed in 17.50? <br />Yes☐ <br />No☐ <br />N/A☐ <br />_____________________ <br />_____________________ <br />_____________________ <br />_____________________ <br />CAP 2.0 <br />(P11) <br />New <br />Construction <br />5. LEED Neighborhood. If the project is <br />neighborhood scale, does it incorporate elements of <br />LEED ND? Provide the LEED ND checklist indicating <br />which elements of Smart Location & Linkage, <br />Neighborhood Pattern & Design, Green Infrastructure <br />& Building, and Innovation & Design Process are <br />achieved. <br />Yes☐ <br />No☐ <br />N/A☐ <br />_____________________ <br />_____________________ <br />_____________________ <br />_____________________ <br /> <br /> <br />1 Covered Projects include: 1) Construction of any City-Sponsored project; 2) Construction of any new commercial/industrial building; 3) Construction of any new residential unit(s) or mixed use project; 4) <br />Renovation/Additions of any commercial or City-sponsored project that is 20,000 gross square-feet or greater (but not including a renovation to a project that consists solely of interior improvements to existing buildings); <br />5) Additions to any residential project that is 2,000 gross square-feet or greater; and 6) Addition to any residential project of any size, if it has been less than five years from the date of certificate of occupancy for original <br />structure.