My WebLink
|
Help
|
About
|
Sign Out
3_Exhibit B
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
AGENDA PACKETS
>
2020 - PRESENT
>
2023
>
02-22
>
3_Exhibit B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/16/2023 1:15:46 PM
Creation date
2/16/2023 1:06:44 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
2/22/2023
DESTRUCT DATE
15Y
Document Relationships
3
(Message)
Path:
\BOARDS AND COMMISSIONS\PLANNING\AGENDA PACKETS\2020 - PRESENT\2023\02-22
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
248
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
HCM 6th Signalized Intersection Summary Cumulative Conditions <br />15: Johnson Dr & Stoneridge Dr Timing Plan: PM PEAK <br />Stoneridge Mall Residential Project 6:00 am 05/06/2010 Existing + Approved + Stoneridge Residential Synchro 10 Report <br />Page 12 <br />Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR <br />Lane Configurations <br />Traffic Volume (veh/h) 350 1740 100 100 2570 140 100 10 90 120 10 330 <br />Future Volume (veh/h) 350 1740 100 100 2570 140 100 10 90 120 10 330 <br />Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0 <br />Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 0.98 1.00 0.99 1.00 1.00 <br />Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 <br />Work Zone On Approach No No No No <br />Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 <br />Adj Flow Rate, veh/h 393 1955 112 112 2888 157 112 11 101 135 0 378 <br />Peak Hour Factor 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 <br />Percent Heavy Veh, %2 2 2 2 2 2 2 2 2 2 2 2 <br />Cap, veh/h 297 2145 123 119 2767 149 166 16 146 454 0 713 <br />Arrive On Green 0.15 0.87 0.87 0.02 0.15 0.15 0.09 0.10 0.09 0.13 0.00 0.14 <br />Sat Flow, veh/h 3954 4941 282 1781 6289 339 1781 157 1442 3563 0 3157 <br />Grp Volume(v), veh/h 393 1345 722 112 2210 835 112 0 112 135 0 378 <br />Grp Sat Flow(s),veh/h/ln1318 1702 1820 1781 1609 1803 1781 0 1599 1781 0 1578 <br />Q Serve(g_s), s 9.0 29.7 30.4 7.5 52.8 52.8 7.3 0.0 8.2 4.1 0.0 12.6 <br />Cycle Q Clear(g_c), s 9.0 29.7 30.4 7.5 52.8 52.8 7.3 0.0 8.2 4.1 0.0 12.6 <br />Prop In Lane 1.00 0.16 1.00 0.19 1.00 0.90 1.00 1.00 <br />Lane Grp Cap(c), veh/h 297 1478 790 119 2123 793 166 0 162 454 0 713 <br />V/C Ratio(X)1.33 0.91 0.91 0.94 1.04 1.05 0.68 0.00 0.69 0.30 0.00 0.53 <br />Avail Cap(c_a), veh/h 297 1478 790 119 2123 793 223 0 518 454 0 1074 <br />HCM Platoon Ratio 2.00 2.00 2.00 0.33 0.33 0.33 1.00 1.00 1.00 1.00 1.00 1.00 <br />Upstream Filter(I)0.78 0.78 0.78 0.44 0.44 0.44 1.00 0.00 1.00 1.00 0.00 1.00 <br />Uniform Delay (d), s/veh51.0 6.4 6.5 58.5 51.3 51.3 52.7 0.0 52.9 47.5 0.0 40.9 <br />Incr Delay (d2), s/veh 163.5 8.0 13.9 39.6 25.3 36.7 4.8 0.0 5.2 0.4 0.0 0.6 <br />Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 <br />%ile BackOfQ(50%),veh/ln7.2 4.3 5.9 4.8 27.6 33.5 3.5 0.0 3.5 1.8 0.0 4.9 <br />Unsig. Movement Delay, s/veh <br />LnGrp Delay(d),s/veh 214.5 14.4 20.4 98.0 76.6 88.0 57.5 0.0 58.1 47.8 0.0 41.5 <br />LnGrp LOS F B C F F F E A E D A D <br />Approach Vol, veh/h 2460 3157 224 513 <br />Approach Delay, s/veh 48.2 80.3 57.8 43.2 <br />Approach LOS D F E D <br />Timer - Assigned Phs 1 2 3 4 5 6 7 8 <br />Phs Duration (G+Y+Rc), s13.7 56.1 13.2 21.2 13.0 56.8 18.2 16.2 <br />Change Period (Y+Rc), s 5.7 * 5.7 4.0 4.9 4.0 5.7 4.9 * 4.9 <br />Max Green Setting (Gmax), s8.0 * 50 13.0 30.0 9.0 49.4 5.0 * 38 <br />Max Q Clear Time (g_c+I1), s9.5 32.4 9.3 14.6 11.0 54.8 6.1 10.2 <br />Green Ext Time (p_c), s 0.0 10.2 0.1 1.6 0.0 0.0 0.0 0.4 <br />Intersection Summary <br />HCM 6th Ctrl Delay 64.1 <br />HCM 6th LOS E <br />Notes <br />User approved volume balancing among the lanes for turning movement. <br />* HCM 6th computational engine requires equal clearance times for the phases crossing the barrier.
The URL can be used to link to this page
Your browser does not support the video tag.