Laserfiche WebLink
HCM 6th TWSC Cumulative Conditions <br />16: Stoneridge Mall Rd & Southeast Project Dwy Timing Plan: PM PEAK <br />Stoneridge Mall Residential Project 6:00 am 05/06/2010 Existing + Approved + Stoneridge Residential Synchro 10 Report <br />Page 13 <br />Intersection <br />Int Delay, s/veh 1 <br />Movement EBL EBT WBT WBR SBL SBR <br />Lane Configurations <br />Traffic Vol, veh/h 6 217 544 13 17 45 <br />Future Vol, veh/h 6 217 544 13 17 45 <br />Conflicting Peds, #/hr 0 0 0 0 0 0 <br />Sign Control Free Free Free Free Stop Stop <br />RT Channelized - None - None - None <br />Storage Length 50 ---0 - <br />Veh in Median Storage, # -0 0 -0 - <br />Grade, %-0 0 -0 - <br />Peak Hour Factor 90 90 90 90 90 90 <br />Heavy Vehicles, %2 2 2 2 2 2 <br />Mvmt Flow 7 241 604 14 19 50 <br />Major/Minor Major1 Major2 Minor2 <br />Conflicting Flow All 618 0 -0 746 309 <br /> Stage 1 ---- 611 - <br /> Stage 2 ---- 135 - <br />Critical Hdwy 4.14 --- 6.84 6.94 <br />Critical Hdwy Stg 1 ---- 5.84 - <br />Critical Hdwy Stg 2 ---- 5.84 - <br />Follow-up Hdwy 2.22 --- 3.52 3.32 <br />Pot Cap-1 Maneuver 958 --- 349 687 <br /> Stage 1 ---- 504 - <br /> Stage 2 ---- 877 - <br />Platoon blocked, %--- <br />Mov Cap-1 Maneuver 958 --- 347 687 <br />Mov Cap-2 Maneuver ---- 347 - <br /> Stage 1 ---- 500 - <br /> Stage 2 ---- 877 - <br />Approach EB WB SB <br />HCM Control Delay, s 0.2 0 12.6 <br />HCM LOS B <br />Minor Lane/Major Mvmt EBL EBT WBT WBR SBLn1 <br />Capacity (veh/h)958 --- 542 <br />HCM Lane V/C Ratio 0.007 --- 0.127 <br />HCM Control Delay (s)8.8 --- 12.6 <br />HCM Lane LOS A ---B <br />HCM 95th %tile Q(veh)0 --- 0.4