My WebLink
|
Help
|
About
|
Sign Out
3_Exhibit B
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
AGENDA PACKETS
>
2020 - PRESENT
>
2023
>
02-22
>
3_Exhibit B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/16/2023 1:15:46 PM
Creation date
2/16/2023 1:06:44 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
2/22/2023
DESTRUCT DATE
15Y
Document Relationships
3
(Message)
Path:
\BOARDS AND COMMISSIONS\PLANNING\AGENDA PACKETS\2020 - PRESENT\2023\02-22
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
248
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
HCM 6th Signalized Intersection Summary Cumulative Conditions <br />14: Stoneridge Dr & I-680 SB Timing Plan: PM PEAK <br />Stoneridge Mall Residential Project 6:00 am 05/06/2010 Existing + Approved + Stoneridge Residential Synchro 10 Report <br />Page 11 <br />Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR <br />Lane Configurations <br />Traffic Volume (veh/h)0 1894 844 0 1022 1010 0 0 0 810 0 444 <br />Future Volume (veh/h)0 1894 844 0 1022 1010 0 0 0 810 0 444 <br />Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 <br />Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 <br />Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 <br />Work Zone On Approach No No No <br />Adj Sat Flow, veh/h/ln 0 1870 1870 0 1870 1870 1870 0 1870 <br />Adj Flow Rate, veh/h 0 2081 0 0 1123 0 890 0 488 <br />Peak Hour Factor 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 <br />Percent Heavy Veh, %0 2 2 0 2 2 2 0 2 <br />Cap, veh/h 0 2808 0 2808 1095 0 884 <br />Arrive On Green 0.00 0.55 0.00 0.00 0.55 0.00 0.32 0.00 0.32 <br />Sat Flow, veh/h 0 5274 1585 0 5443 0 3456 0 2790 <br />Grp Volume(v), veh/h 0 2081 0 0 1123 0 890 0 488 <br />Grp Sat Flow(s),veh/h/ln 0 1702 1585 0 1702 0 1728 0 1395 <br />Q Serve(g_s), s 0.0 18.6 0.0 0.0 7.6 0.0 14.2 0.0 8.7 <br />Cycle Q Clear(g_c), s 0.0 18.6 0.0 0.0 7.6 0.0 14.2 0.0 8.7 <br />Prop In Lane 0.00 1.00 0.00 0.00 1.00 1.00 <br />Lane Grp Cap(c), veh/h 0 2808 0 2808 1095 0 884 <br />V/C Ratio(X)0.00 0.74 0.00 0.40 0.81 0.00 0.55 <br />Avail Cap(c_a), veh/h 0 2808 0 2808 1152 0 930 <br />HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 <br />Upstream Filter(I)0.00 0.11 0.00 0.00 0.68 0.00 1.00 0.00 1.00 <br />Uniform Delay (d), s/veh 0.0 10.3 0.0 0.0 7.8 0.0 18.9 0.0 17.0 <br />Incr Delay (d2), s/veh 0.0 0.2 0.0 0.0 0.3 0.0 4.4 0.0 0.6 <br />Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 <br />%ile BackOfQ(50%),veh/ln0.0 4.9 0.0 0.0 2.1 0.0 5.6 0.0 2.5 <br />Unsig. Movement Delay, s/veh <br />LnGrp Delay(d),s/veh 0.0 10.5 0.0 0.0 8.1 0.0 23.2 0.0 17.6 <br />LnGrp LOS A B A A C A B <br />Approach Vol, veh/h 2081 A 1123 A 1378 <br />Approach Delay, s/veh 10.5 8.1 21.2 <br />Approach LOS B A C <br />Timer - Assigned Phs 2 4 6 <br />Phs Duration (G+Y+Rc), s 37.0 23.0 37.0 <br />Change Period (Y+Rc), s 5.7 4.9 5.7 <br />Max Green Setting (Gmax), s 30.3 19.1 30.3 <br />Max Q Clear Time (g_c+I1), s 20.6 16.2 9.6 <br />Green Ext Time (p_c), s 7.0 1.9 5.5 <br />Intersection Summary <br />HCM 6th Ctrl Delay 13.1 <br />HCM 6th LOS B <br />Notes <br />Unsignalized Delay for [EBR, WBR] is excluded from calculations of the approach delay and intersection delay.
The URL can be used to link to this page
Your browser does not support the video tag.