My WebLink
|
Help
|
About
|
Sign Out
3_Exhibit B
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
AGENDA PACKETS
>
2020 - PRESENT
>
2023
>
02-22
>
3_Exhibit B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/16/2023 1:15:46 PM
Creation date
2/16/2023 1:06:44 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
2/22/2023
DESTRUCT DATE
15Y
Document Relationships
3
(Message)
Path:
\BOARDS AND COMMISSIONS\PLANNING\AGENDA PACKETS\2020 - PRESENT\2023\02-22
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
248
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Page 7 <br />kimley-horn.com 4637 Chabot Drive, Suite 300, Pleasanton, CA 94588 925.398.4840 <br />156380685.4 <br />D.LOCAL TRAFFIC ANALYSIS BASED ON HIGHWAY CAPACITY MANUAL <br />METHODOLOGY <br />A traffic analysis was undertaken to determine the consistency of the potential effects of all the <br />development referenced above on levels of service at localized intersections with the General Plan, <br />based on standards and methodology set forth by the City of Pleasanton and Alameda County. The <br />study area for the traffic study is shown in Figure 2 and analyzed the following 16 intersections: <br />1. Foothill-San Ramon Blvd / I-580 WB Ramps <br />2. Foothill-San Ramon Blvd / I-580 EB Ramps <br />3. Foothill Road / Dublin Canyon Road-Canyon Way <br />4. Stoneridge Mall Road / Canyon Way <br />5. Stoneridge Mall Road / BART Garage <br />6. Stoneridge Mall Road / Embarcadero Court <br />7. Stoneridge Mall Road / East Project Driveway <br />8. Springdale Avenue / Stoneridge Mall Road <br />9. Stoneridge Mall Road / Southwest Project Driveway <br />10. Stoneridge Mall Road / Stoneridge Mall Road-Genomics Place <br />11. Foothill Road / Stoneridge Drive <br />12. Springdale Avenue / Stoneridge Drive <br />13. Stoneridge Mall Road / Stoneridge Drive <br />14. I-680 SB Ramps / Stoneridge Drive <br />15. Johnson Drive / Stoneridge Drive <br />16. Stoneridge Mall Road / Southeast Project Driveway <br />The traffic analysis studied Cumulative traffic conditions, as shown in the City’s Synchro model, with <br />the addition of the recently approved 10x Genomics project located on the southeast corner of <br />Stoneridge Mall Road and Genomics Place. The Cumulative conditions are addressed because they <br />present the worst-case scenario (i.e. buildout of Workday, Stoneridge Mall, Housing Element, 10x <br />Genomics, and other nearby approved developments) appropriate for assessing General Plan <br />consistency. In addition, an existing conditions analysis would capture only the conditions at the <br />specific time that traffic counts are collected in the field, which do not include all the development <br />referenced above, and these counts would be representing ongoing construction and partial occupancy <br />of office buildings in the area that would fluctuate on a month to month basis. The following describes <br />the details under Cumulative traffic Conditions.
The URL can be used to link to this page
Your browser does not support the video tag.