My WebLink
|
Help
|
About
|
Sign Out
3_Exhibit A
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
AGENDA PACKETS
>
2020 - PRESENT
>
2023
>
02-22
>
3_Exhibit A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/16/2023 1:06:43 PM
Creation date
2/16/2023 1:06:25 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
2/22/2023
DESTRUCT DATE
15Y
Document Relationships
3
(Message)
Path:
\BOARDS AND COMMISSIONS\PLANNING\AGENDA PACKETS\2020 - PRESENT\2023\02-22
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Resolution No. PC-2023-06 <br />Page Twenty-Four <br /> <br /> <br />Infiltration Analysis” for each subbasin. The Basin I.D. is from Figure ES-3. Minimum <br />allowable PF = 2.0. <br />l. Backflow prevention devices must be installed if the lowest plumbing fixture in the building <br />is lower than the downstream cleanout overflow device or manhole to assure effluent <br />discharge outside of the building in case the downstream pipe network becomes <br />obstructed. <br />m. Fats, Oils, and Grease (FOG) controls: Discharge of FOG to the City’s sanitary sewer <br />system shall conform to Pleasanton Municipal Code Chapter 15.44. In addition to other <br />controls, a sampling manhole must be provided immediately downstream of any grease <br />interceptor in accordance with City Standard Drawing 402. (Address this condition prior to <br />plan approval) <br /> <br />74. POTABLE WATER SYSTEM DESIGN STANDARDS: All permanent connections to the City’s <br />potable water network shall conform to Pleasanton Municipal Code §14.04.050. Any required <br />water pressure and/or flow needed by the applicant beyond that available from the network at the <br />point-of-connection must be provided by the applicant as a private improvement on the customer <br />side of the meter or backflow prevention device. All extensions or upgrades to the potable water <br />network shall be designed to satisfy the following minimum standards: <br />a. Minimum number of valves: <br />i. three at cross intersections <br />ii. two at “T” intersections <br />iii. approximately 500 feet maximum spacing <br />iv. one valve at each fire hydrant lateral <br />v. Pressure regulating valve station required between pressure zones <br />b. Minimum number of fire hydrants (subject to approval by Livermore-Pleasanton Fire <br />Department (LPFD) Fire Marshal: <br />i. one hydrant within approximately 250 feet of any existing or proposed structure <br />ii. two hydrants within approximately 500 feet of any commercial, multi-family <br />residential, industrial, or school building <br />c. Minimum pipe size: <br />i. approximately six-inch diameter for any line <br />ii. approximately eight-inch diameter for straight runs longer than approximately <br />1,000 feet <br />d. Minimum depth of cover over pipe: approximately 42 inches <br />e. Blowoff requirements: <br />i. At all dead ends whether temporary or permanent <br />ii. At all low points in the line (Address this condition prior to plan approval) <br /> <br />75. UTILITY ENCLOSURES: Proposed utility enclosures including vaults, meter boxes, splice boxes, <br />and pedestals shall be installed in the public right-of-way, in a public service easement (PSE), or <br />in a utility company specific easement. The locations for utility enclosures shall be considered in <br />the following order of preference: (1) PSE area behind public sidewalk; (2) parkstrip area between <br />the roadway curb & gutter and the sidewalk; (3) within the public sidewalk set flush to grade; (4) <br />within driveway approach areas set flush to the surface with traffic-rated lids. In no case shall an <br />above-ground pedestal or utility cabinet obstruct sight-line visibility for vehicle drivers at <br />intersections or driveways. Above-ground pedestals or utility cabinets are preferred within the <br />side-yard area of a corner residential lot rather than the front-yard. Deviations from this standard <br />must be approved by the City Engineer. (Address this condition prior to plan approval) <br /> <br />76. ENCROACHMENT PERMIT: Any work performed within the City’s right-of-way, City easements, <br />or City-owned property shall be subject to an Encroachment Permit as defined in Pleasanton
The URL can be used to link to this page
Your browser does not support the video tag.