My WebLink
|
Help
|
About
|
Sign Out
16
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2023
>
011723
>
16
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2023 1:49:54 PM
Creation date
1/11/2023 1:49:52 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
1/17/2023
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
programming in October will allow for robust retail and restaurant activity during the <br /> holiday season in November and December. This schedule also takes into <br /> consideration the likelihood of inclement weather during the late fall, which keeps much <br /> of the foot traffic out of downtown. The Board's request is summarized in a letter <br /> provided as Attachment 1. <br /> Expenses <br /> As noted, the First Weekends on Main program is not without cost to the City. In 2020 <br /> and 2021 , the City contracted with a vendor at a cost of$188,000 to set-up and remove <br /> the barricades each weekend, while using staff to manage signage and related traffic <br /> circulation measures. Additionally, the City incurs indirect costs for police and traffic <br /> engineering staffing, downtown cleaning, and event oversight; these are absorbed as <br /> part of ongoing departmental operations. <br /> In 2022, the eight First Weekends on Main street closures were executed completely by <br /> Operations Services, Traffic Engineering, and Police staff, in addition to the cost of <br /> equipment rentals. The cost was approximately $71,000, which included contracting <br /> with a vendor for barricade rentals, staff overtime for the street closures and <br /> placement/removal of signage and traffic circulation measures, staff time for garbage <br /> removal, and trash/dump truck fees. <br /> The 2023 First Weekends on Main street closures is estimated to generate direct <br /> expenses of approximately $54,000 to the City for the recommended six weekends <br /> ($9,000 per weekend), including contracting with a vendor for barricade rentals <br /> ($20,000), Operations Services Department staff overtime for placement/removal of <br /> barricades to close and re-open Main Street and placement/removal of signage and <br /> traffic circulation measures ($27,000), Parks Division staff time for garbage removal <br /> ($5,000) and trash/dump truck fees ($2,000); these costs are included in the fiscal year <br /> budget of the Operations Services Department. <br /> The use of City staff to close and re-open the streets, as compared to using a vendor, <br /> significantly reduces the overall cost but does result in some overtime-staffing costs. <br /> This option is feasible with the current once per month frequency; should the frequency <br /> be increased, the City would need to contract with an outside vendor thereby <br /> significantly increasing the cost. Additionally, in consideration for future First Weekends <br /> on Main programming, the barricade rental cost could be eliminated if the City <br /> purchases the equipment. Depending on the Council's direction, staff will use the least <br /> costly option available. <br /> Framework <br /> In addition to the above discussion and given the positive response of 2022 <br /> programming, City staff supports the PDA Board of Directors' recommendation for <br /> resuming and incorporating into the Pleasanton Downtown Association's annual events <br /> programming for 2023 as follows: <br /> Page 4 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.