Laserfiche WebLink
Affordability Mix: The IZO currently does not specify the desired affordable housing mix <br />in terms of income levels, and past practice has been to negotiate this with developers <br />through the Affordable Housing Agreement. However, with the new emphasis in State <br />law on objective standards, the City has less ability to negotiate this. Since it will likely <br />take some time to complete the updates to the IZO, staff recommends the Objective <br />Design Standards for Housing Element sites include a target income mix for affordable <br />rental units: <br />A minimum of 25 -percent of units at no more than 50 -percent AMI ("Very <br />Low -Income Units), <br />A minimum of 25 -percent of units at no more than 60 -percent AMI (Low -Income <br />Units); and <br />No more than 50 -percent of units at no more than 80 -percent AMI (reflecting the <br />low end of the Moderate -Income range (80 -120 -percent AMI). <br />For ownership units, staff recommends unit prices be set at no more than 120 -percent <br />AMI, which is a Moderate -Income range within which most households will be able to <br />qualify for a first mortgage. <br />Staff believes this mix would secure more units in the hardest to reach very low-income <br />categories, as well as allowing for a balance that will be economically viable for <br />developers and allow for a proportion of units to meet moderate income "workforce" and <br />middle-income housing goals. With update of the IZO there will be opportunity to study <br />the appropriate affordability mix in more detail and amend it if needed, but in the interim <br />the IZO will ensure any projects that move forward are held to a high standard for <br />affordability. <br />Site Selection <br />The City's existing zoning (i.e., residential development capacity that exists currently <br />within Pleasanton's residential and mixed-use zoning districts) and "pipeline" of entitled <br />projects is estimated to accommodate approximately 2,792 housing units; this number <br />includes 93 ADUs that are assumed will be built during the Housing Element period. <br />This estimated capacity reflects a shortfall of 3,173 units when compared to the total <br />RHNA allocation (total of 5,965 units). Thus, a total of up to 24 additional sites have <br />been identified which may be considered for future rezoning to allow housing. This list <br />was initially longer, though has been reduced throughout the process. Area 3 (Donlon) <br />was the most recent removal, though is still reflected in some of the analysis <br />documents, including the CEQA Environmental Impact Report, due to the timing of <br />when the decision was made to remove the site from the list. <br />As noted, currently the sites inventory includes 24 sites (Attachment 5) which <br />represents a surplus of units above the required RHNA, particularly in the <br />very-low/low-income category (generally derived from sites identified for density above <br />30 dwelling units/acre), and a smaller surplus of moderate- and above -moderate units. <br />As additional analysis (i.e., CEQA and LOS) is now available and HCD has concluded <br />its initial review of the Draft Housing Element, staff recommends narrowing the site list <br />to closer reflect the required RHNA. <br />Page 9 of 21 <br />