Laserfiche WebLink
vicinity maps, collision diagrams,demonstrative exhibits, letters of support, and other application requirements. Mark <br /> Thomas will coordinate support with stakeholders as identified by the City.We will also package and submit the grant <br /> applications on behalf of the City. <br /> Task 1.6. Quality Control <br /> The Mark Thomas Quality Control plan consists of established procedures for performing the work(which are <br /> reassessed with each project), including methods for design calculations,establishing appropriate levels of design <br /> development for intermediate submittals, identification of required plan checks, design checklists, and methods of <br /> project documentation. <br /> Our QC/QA Manager will implement and maintain these quality control procedures during the preparation of plans <br /> and documents throughout design. <br /> TASK 1 DELIVERABLE(S). <br /> • Monthly progress reports and invoices <br /> • Monthly CPM schedule updates <br /> • Project Cloud-based File Repository <br /> • Project Team Meeting Attendance w/agendas and minutes(up to 16 meetings) <br /> • Stakeholder Meetings(up to 1) <br /> • Public Meetings(Up to 3) <br /> • Optional: Funding Recommendations Memo <br /> • Optional: Funding Application Support(up to 2 grant applications) <br /> • QC/QA Checklist <br /> • All deliverables to be submitted electronically in.pdf format unless specified otherwise <br /> Task2. SITE INVESTIGATIONS AND SURVEYS <br /> Task 2.1. Project Initiation and Data Gathering <br /> Mark Thomas will coordinate the project kick-off meeting with the City and members of the design team to discuss the <br /> project background, scope, concepts, schedule, project management, potential stakeholders and issues,outreach <br /> opportunities and expectations. Mark Thomas will provide a project information gathering checklist to collect data <br /> elements needed for the design, including GIS mapping information, City-owned facility maps, CCTV inspection reports, <br /> utility contacts,as-built and planned improvement drawings,and available collision, speed studies, and traffic count <br /> information. <br /> The data gathering process will include a review of the existing site characteristics. Mark Thomas will conduct site <br /> visits and take photographic inventory of existing conditions to reference during the design process and make <br /> observations related to sight distance at pedestrian crossings,ADA-compliance and potential tripping hazards on <br /> the sidewalks and identify potential conflicts with existing utilities and privately-owned improvements within the <br /> public right-of-way. For estimating purposes, 2 days of site visits have been assumed to complete the field reviews. <br /> A photo log for each project location will be prepared and submitted to the City electronically. <br /> Task2.2. Topographic Surveys and Base Map Preparation <br /> Mark Thomas proposes the following work plan to set project control, collect topographic survey, provide electronic <br /> base files for the design, and delineate public right-of-way limits as described below. <br /> The general requirements for the work under this scope are listed below: <br /> • These tasks will be completed under the direct supervision of a California Licensed Land Surveyor. <br /> • Base mapping will be delivered in AutoCAD Civil 3D 2018 or earlier version as required by the City. <br /> • Submittal of electronic information may be transmitted by email or posted to the Mark Thomas FTP site (or other <br /> FTP site, as directed) under password protection with instruction for retrieval and password transmitted by email. <br /> Available AutoCAD base mapping for the design, based on aerial photograph and GIS information,will be furnished <br /> by the City. Mark Thomas will utilize City-furnished base mapping to prepare preliminary plans and details. <br />