My WebLink
|
Help
|
About
|
Sign Out
09
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2022
>
120622
>
09
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2022 12:15:35 PM
Creation date
11/30/2022 12:15:28 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
12/6/2022
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Fehr& Peers will prepare 20-scale sheets for the traffic signal modification plans at a preliminary level to <br /> illustrate the basis for further design.These preliminary plans will show the locations of push button, detection <br /> zone, and signal head modifications identified in Task 3.5.These modifications will be shown on top of existing <br /> traffic signal as-builts. We will deliver the 35%design along with cost estimates; we have assumed specifications <br /> will be developed at the 65%stage. <br /> TASK 5DELI VERABLE(5): <br /> • 35% Plans and Estimate <br /> • Preliminary Landscape Plans and Treatment Options <br /> • Preliminary Traffic Signal Plans <br /> • Peer Review of 35% Plans <br /> • All deliverables will be submitted in.pdf format unless specified otherwise <br /> Task6. FINAL DESIGN <br /> Not included in this phase. <br /> Task 6.1. 65% PS&E <br /> Not included in this phase. <br /> Task6.2. 95% PS&E <br /> Not included in this phase. <br /> Task 6.3. 100% (Pre-final and Bid Set)PS&E <br /> Not included in this phase. <br /> Task 6.4. Draft and Final Storm Water Management Plan <br /> Not included in this phase. <br /> Task 6.5. Draft and Final SWPPP <br /> Not included in this phase. <br /> Task 6.6. Constructability Reviews <br /> Not included in this phase. <br /> Task 7. Design Support During Bidding <br /> Not included in this phase. <br /> Task 7.1. Bid Document Revisions <br /> Not included in this phase. <br /> Task 7.2. Bid Addenda <br /> Not included in this phase. <br />
The URL can be used to link to this page
Your browser does not support the video tag.