My WebLink
|
Help
|
About
|
Sign Out
09
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2022
>
120622
>
09
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2022 12:15:35 PM
Creation date
11/30/2022 12:15:28 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
12/6/2022
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project Assumptions <br /> This scope of services is based on the following assumptions: <br /> • Federal funds are not included with the Project and coordination with Caltrans Local Assistance for right of <br /> way certification, authorization to construct, and to prepare documents required in the Local Assistance <br /> Procedures Manual (LAPM) is not included in this scope of work. <br /> • The project is expected to be Categorically Exempt under CEQA.The City will prepare and file all <br /> environmental clearance documents for the project. <br /> • The project will be advertised, awarded, and administered by the City and the City will coordinate <br /> reproductions of the bid package. <br /> • This scope does not include an RE file. <br /> • City will lead the effort to identify pavement section dig out and reconstruction areas to be shown on the <br /> plans. <br /> • Geotechnical services during construction will be provided by the City. <br /> • The City will lead the effort and will provide rights of entry to private property.The City will obtain and <br /> provide encroachment permits, at no fee, for work within public right of way. <br /> • A Record of Survey is not included in this scope of work. <br /> • Property acquisition and appraisals will be provided by others and is not included in this scope <br /> • Optional design services by Fehr& Peers, not included in this scope of service, but that may be completed <br /> for an additional fee to be negotiated prior to beginning work include the following: <br /> o Traffic signal modifications or new traffic signal designs for locations where additional signal <br /> equipment upgrades or changes are deemed necessary or required due to changes in roadway <br /> geometry or lane configurations. <br /> o Corridor Lighting Improvements <br /> o Signal Interconnect& Communication Plans <br /> o Temporary Signal Plans for Construction Staging <br /> MILESTONE SCHEDULE <br /> Milestone Estimated Completion <br /> Execute Contract December 2022 <br /> Site Investigations and Surveys December 2022 to March 2023 <br /> Concept Development and December 2022 to March 2023 <br /> Stakeholder Outreach <br /> Public Meetings April 2023 <br /> 35%Plans and Estimates April 2023 to June 2023 <br /> 65%PS&E June 2023 to August 2023 <br /> 95%PS&E August 2023 to December 2023 <br /> 100%PS&E December 2023 to February 2024 <br /> Bid Plans and Specifications March 2024 <br /> Advertise and Award March 2024 to June 2024 <br /> Construction September 2024 to 2025 <br />
The URL can be used to link to this page
Your browser does not support the video tag.