Laserfiche WebLink
Sequoia Ecological Consulting,Inc. Page <br /> Final Scope of Work for Environmental Regulatory Compliance& 6 of 14 <br /> Habitat Mitigation Services for Stream Maintenance Project <br /> October 2022 <br /> including nesting bird surveys, concurrently across one or more project sites to save on <br /> mobilization and travel costs. <br /> Table 1. Species-Specific Biological Survey Summary Table <br /> Survey Project Sites/ <br /> Timing Sequoia's Capability and Action <br /> Target Habitats <br /> MM BIO-2 Apr/May C-05,C-06,P-06,P-01 to P-04 Sequoia's Senior Biologist and CNPS Certified Consulting <br /> Congdon's — Grasslands with alkaline soil Botanist Andrew Ford and Project Manager Ari Rogers are <br /> tarplant and Sep/Oct both deeply familiar with local special-status plant species, <br /> San Joaquin particularly Congdon's tarplant,and CDFW survey protocol <br /> spearscale (CDFW 2018)and will lead efforts to determine <br /> presence/absence of these two species. <br /> MM B10-3b Mar 15— C-02,C-10,P-01 to P-03 Per MM BIO-3b,Sequoia's avian experts will perform an <br /> Tricolored Aug 15 assessment for the presence of tricolored blackbird prior to <br /> blackbird wetland vegetation removal occurring during tricolored <br /> blackbird nesting season(March 15-August 15)and <br /> concurrently with a nesting bird survey. <br /> MM B1O-4 Year- C-04,C-05,P-02,P-03 Sequoia's biologists are experienced at performing protocol- <br /> Burrowing round level surveys for burrowing owl following CDFW protocols <br /> owl (CDFW 2012)and will complete pre-construction surveys for <br /> burrowing owl 14 days and within 48 hours prior to the start <br /> of work,or as otherwise advised by CDFW. <br /> MM BIO-8 Mar— Sites with high noise levels or Sequoia's team of qualified bat biologists will provide <br /> Roosting Oct removal of trees>12" assistance to determine the need for pre-construction <br /> bats diameter roosting bat surveys,and if needed,will lead surveys within <br /> 30 days prior to commencement of activities to assess the <br /> presence of potential bat roosting habitat. <br /> Field effort for biological surveys: All services are for full days(8 hours/day), plus up to 2 hours <br /> for reporting.The number of biological surveys allotted per year will be as follows, based on the <br /> activity estimates and work sequences provided by the City: <br /> • 2023—19 days <br /> • 2024—17 days <br /> • 2025—19 days <br /> • 2026—21 days <br /> • 2027—21 days <br /> The type and location of biological surveys needed in a given year was determined based on the <br /> permit and MMRP requirements and the City-provided activity estimates and work sequence; <br />