Laserfiche WebLink
e- Sequoia Ecological Consulting,Inc. Page <br /> Final Scope of Work for Environmental Regulatory Compliance& 3 of 14 <br /> Habitat Mitigation Services for Stream Maintenance Project <br /> October 2022 <br /> — Pre-Construction: Immediate Work Commencement Notification; Work Schedule and <br /> Notice of Proposed Work; Annual Work Plan; Mitigation Proposal; Nesting Bird Survey <br /> Methodology; Dewatering Plan (can be concurrent with Annual Work Plan); <br /> Commencement of Construction Report <br /> — During-Construction: California Natural Diversity Database (CNDDB) Observation Forms; <br /> Fish/Amphibian Relocation Record; Active Bird/Raptor Nest Consultation;Work Window <br /> Extension Requests; <br /> — Post-Construction: Project Construction Completion Report; Notification of Completion <br /> of Activities. <br /> — As-Needed/Optional: Lessons Learned Discussion (Optional); Notification of Ownership <br /> Changes, Water Quality, Discharge Change, etc. (if needed); Notification of Conflicting <br /> Provisions, Project Modifications, Activities Listed in Provision 1.9 of SAA, etc. (if <br /> needed). <br /> • Construction Binder <br /> • Biologist Resume Approvals Package <br /> • Comprehensive Environmental Compliance Matrix <br /> • Note: Deliverables listed above are anticipated but actual deliverables prepared during SMP <br /> implementation may vary. Upon City request, Sequoia may prepare other deliverables not <br /> explicitly required by regulatory permits, such as Special-Status Species Encounter/Relocation <br /> Plans,Avian Protection Plans, etc.All deliverables will be submitted electronically unless <br /> specifically requested or required. <br /> TASK 2. CEQA COMPLIANCE AND DOCUMENTATION <br /> In tandem with the regulatory permits noted in Task 1, Sequoia will provide streamlined assistance in <br /> the verification of CEQA compliance per the City's CEQA Mitigation Monitoring and Reporting Program <br /> (MMRP)for the SMP.With our CEQA Compliance Lead Steve Towers, PhD, at the helm, our Project <br /> Team will coordinate with the City and its contractors to ensure MMRP requirements are met using the <br /> established MMRP format to document and verify CEQA compliance throughout the Project term. <br /> Sequoia may send updates on compliance/verification status or the most recent version of the MMRP <br /> table during the Project term at the request of the City. <br /> Task 2 Deliverables <br /> • Final Completed MMRP Table (submitted at end of Project term) <br />